The tender has closed (12/1/2025). Current tenders
Tender
TENDER [Transportation services within and outside of Baku for the office]
From the attached document
Individual assessment/overall assessment (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting Points Assessment Points Assessment Points Assessment Points Assessment Points Assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) 1 1.6.
1.6.1 15% 0.0 0.0 0.0 0.0 0.0 1.6.2 15% 0.0 0.0 0.0 0.0 0.0 1.6.3 15% 0.0 45% 0.0 0.0 0.0 0.0 0.0 45% 0.0 0.0 0.0 0.0 0.0 2.6 2.6.1 10% 0.0 0.0 0.0 0.0 0.0 2.6.2 5% 0.0 0.0 0.0 0.0 0.0 2.6.3 5% 0.0 0.0 0.0 0.0 0.0 20% 0.0 0.0 0.0 0.0 0.0 20% 0.0 0.0 0.0 0.0 0.0 3 3.6.1. 5% 0.0 0.0 0.0 0.0 0.0 3.6.2. 5% 0.0 3.6.3. 5% 0.0 3.6.4. 5% 0.0 3.6.5. 5% 0.0 3.6.6. 5% 0.0 3.6.7. 5% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 35% 0.0 0.0 0.0 0.0 0.0 100% 0.0 0.0 0.0 0.0 0.0 0.00% 0.00% 0.00% 0.00% 0.00%
The vehicles are not older than 2020 in good running condition, clean interior, non-smoking and with proven accident-free track record.
The vehicles are equipped with general safety requirements (first aid kit, warning triangle and high visibility jacket, spare tire, toolbox, jumping cable, torch, fire extinguisher and towing cable).
The vehicles are annually checked in a professional workshop.
Drivers ensure that the vehicles are ready for operations on a daily basis (this including checking gas, front and back lights, fluid and water levels, tires condition and air pressure and windshield wipers.
All vehicles used are compliant with the Azerbaijani transport safety authority requirements.
Grid for the technical assessment of bids below the EU threshold (Local)
The company has 3 years of experience with service delivery to international and/or governmental organizations working in
Interim total 2.6
The drivers are basically fluent in English (A1)
The drivers have valid driver’s licences.
Drivers
The drivers have a min. of 3 years of driving experience.
Version (Delete as appropriate):
Enter tenderer 1
The company can provide an English-speaking contact person for transportation services 24/7.
Project:
Enter tenderer 2 Enter tenderer 3 Enter tenderer 4 Enter tenderer 5
Tenderers 1 to 5 of 10
Services put out to tender:
03.9207.6-007.00 Processing number:
Transaction number:
Officer responsible for the commission:
(1)
Assessor:
Date, name
Interim total 1.6
Assessment in %
I hereby declare that I completed this assessment independently, to the best of my knowledge and in good faith.
Overall total 1 + 2 +3
Ranking
Total 2
Assessment of technical-methodological design
Vehicle types are conventional sedan four-door passenger cars with a 3-box design with separate areas for the engine, passenger and
Criterion 25% of the vehicle fleet consists of electric / hybrid vehicles.
Vehicle fleet
Total 3
Management
The company has 5 years of experience in the transportation or taxi sector.
Total 1
Form 31-8-1-de Page 1 of 1
PUBLIC
Updated: December 2024 Page 1
General terms and conditions of contract (‘local terms and conditions’) for supplying services and work on behalf of the Deutsche Gesellschaft für
Internationale Zusammenarbeit (GIZ) GmbH in Georgia
1. General provisions for supplying work and services
1.1. Applicable law, place of jurisdiction
The contract is subject to the laws of Georgia. The contractor’s general terms and conditions of business or payment shall not apply. The place of jurisdiction is Georgia. GIZ may also institute proceedings against the contractor before the competent court for the latter’s place of residence or place of business or habitual place of residence.
1.2 Form
Any amendments or supplements to the contract and all material communications must be in text form unless the parties have made different arrangements or a stricter format is prescribed by law.
1.3 Quality of work and services
The work and services to be provided must comply with the recognised state of scientific knowledge and the generally accepted rules of technology as well as the terms of reference.
They must be of excellent quality.
1.4 Confidentiality
Any and all data relating to the contract as well as any other
GIZ information, such as submitted documents and exchanged information of which the contractor and its employees become aware in the course of performing the contract, must be treated as confid ential during and beyond the term of the contract. This provision applies even if such documentation and information has not been explicitly designated as secret or confidential. As a matter of principle, such information shall only be made accessible and known to persons for whom it is essential for the fulfilment of their tasks (need-to-know principle).
Contractors shall not allow third parties to access documentation or work results of any kind, in particular reports, without the prior consent of GIZ in text form. Third parties under this provision also include the ultimate commissioning party/client.
1.5 Requirement for GIZ’s approval for publications
Any publications regarding the contractor’s activities within the framework of the project require the prior approval of GIZ in text form, even after the contract has come to an end. GIZ approval is not required for brief descriptions of the contract and of the scope of activities that are intended for use in the contractor’s PR work. An outline of the subject matter of the contract and the key results constitutes a brief description. The contractor must always express in an appropriate way that its activities are performed on behalf of GIZ and must name the ultimate commissioning party/client and any other financing parties.
1.6 Use of GIZ’s corporate design
When designing materials relating to the contract that are intended for use with third parties (e.g. business cards, letterheads, emails, publications, presentations), the provisions of the Corporate Design Center (https://www.giz.de/cdc/en/html/59557.html) and other GIZ specifications must be followed. The design must also be agreed with GIZ and in the event of direct cooperation also with the responsible partner institution.
1.7. Property rights and rights of use 1.7.1 Basic principle
Unless otherwise agreed in the contract documents, the contractor shall assign to GIZ all assignable ownership and property rights to its work results. If the work results are protected by copyright or other non-assignable property rights, the contractor shall grant GIZ an exclusive and irrevocable right that is unlimited with respect to time, location and content to use all work results, including for c ommercial use outside the measure. Furthermore, the originator expressly waives the right to be named as such.
1.7.2 Work results
Work results for the purposes of Section 1.7.1. are all material and immaterial outputs that are created or procured in performance of the contract, especially studies, drafts, documentation, articles, information, illustrations, drawings, calculations, plans, photos, materials, film negatives, imag e files and other visual presentations. Work results shall also include any computer programs that the contractor produces, modifies, procures or makes available in performance of the contract.
1.7.3 Scope of rights of use
GIZ’s rights of use shall include the right to use the work results without limitation with respect to time, content and location. GIZ is further entitled to assign to third parties the rights of use granted or to grant third parties simple rights of use.
1.7.4 Freedom from third-party rights
The contractor warrants that the work results are free from any copyright or other third -party rights that would prejudice the use of the work results pursuant to Section 1. 7.3. The contractor shall defend GIZ from all claims arising from an infringement of industrial property rights, copyrights or any other property rights due to the use of the work results as agreed in the contract and shall meet all costs and damages imposed on GIZ by a court of law insofar as GIZ has informed the contractor without delay of any such claims and the contractor is entitled to take defensive acti on or negotiate a settlement. The aforementioned obligation on the part of the contractor shall not apply if the contractor is not responsible for the infringement of the rights.
PUBLIC
Updated: December 2024 Page 2
1.7.5 Compensation
The contractually agreed remuneration also includes the granting of rights of use.
1.7.6 Contractor’s right of use for its own purposes
GIZ may grant the contractor the right – in text form – to use the work results for its own purposes free of charge. GIZ will permit such use if and to the extent that the contractor can demonstrate a legitimate interest and this does not conflict with GIZ’s interests. The contractor must name GIZ whenever the work results are used.
1.8 Data protection
Within the framework of the contract, GIZ processes personal data exclusively in accordance with the EU General Data
Protection Regulation (EU GDPR) and other applicable data protection regulations.
The contractor shall comply with the requirements of applicable data protection regulations and require such compliance of its employees.
The contractor warrants that any data transmitted to GIZ have been processed in accordance with the applicable data protection provisions and are exempt from any third -party rights which could prejudice the use of these data within the framework of this contract. The contractor shall indemnify GIZ against all claims arising from the violation of data protection regulations and shall reimburse GIZ for all costs incurred in connection with its corresponding legal defence or the imposition of government sanctions.
Should applicable data protection law contain specific principles that must be respected when providing work and services (e.g. a privacy by design or default approach in order to ensure the data protection -friendly implementation of technical requirements), the contractor shall place particular emphasis on the practical application of such principles.
Should the contractor process personal data for GIZ as set out in Article 28 GDPR, this shall take place on the basis of a relevant agreement.
1.9 Prevention of the financing of terrorism and compliance with embargoes
The contractor shall not make any funds or other economic resources available, directly or indirectly, to third parties that are included on a sanctions list issued by the United Nations and/or the EU.
When implementing the contract, the contractor may enter into and/or maintain business relations only with third parties that are reliable and to whom no statutory ban on entering into contractual or business relations applies.
When implementing the contract, the contractor must also comply with embargoes and other trade restrictions issued by the United Nations, the EU or the Federal Republic of
Germany.
The contractor must notify GIZ without delay and on its own initiative if the contractor, a member of its official managing body and/or other administrative bodies (in this context its shareholders and/or staff) is included on a sanctions list issued by th e United Nations or the EU. This provision also applies if the contractor becomes aware of an event that would lead to such a listing.
The contractor shall notify GIZ without delay and on its own initiative of any violation of the provisions stipulated in this
Section 1.9. This does not affect GIZ’s rights under Sections 5 and 6 of these Terms and Conditions.
1.10 Obligations resulting from the Code of Conduct 1.10.1 Code of Conduct for contractors
The contractor shall guarantee with regard to its own business activities that it acts in accordance with the Code of Conduct for Contractors of the Deutsche Gesellschaft für Internationale
Zusammenarbeit (GIZ) GmbH (‘Code of Conduct’) (Annex 4).
It warrants that it will appropriately apply the provisions of the
Code of Conduct along the supply chain if GIZ establishes the existence of a human -rights or environment -related risk and notifies the contractor thereof.
The contractor is obliged to hold GIZ harmless from third-party claims resulting from a breach of the Code of Conduct unless the contractor can prove that it is not responsible for the breach.
1.10.2 Preventive measures
The contractor must take appropriate measures to minimise the risk of breaches of the provisions of the Code of Conduct.
If GIZ identifies (new) risks during performance of the contract, additional preventive measures must be taken. GIZ is entitled to instruct the contractor to take specific measures.
1.10.3 Ensuring access to the complaints procedure in the supply chain
The contractor shall ensure unhindered access for all of its employees to the complaints procedure set up at GIZ. In particular, the contractor shall not undertake any actions that hinder, prevent or complicate access to the complaints procedure. This also applies to reports that human -rights or environment-related obligations have been violated due to the actions of an indirect supplier.
1.10.4 Warranted controls
GIZ is entitled to check whether the contractor complies with the provisions of the Code of Conduct if compliance risks have been identified and the contractor has been informed of them.
The corresponding control measures must be appropriate and give due c onsideration to the contractor’s justified concerns.
In particular, control measures include the request for comprehensive disclosure, on -site checks by GIZ or a commissioned third party and mandatory certification in line with recognised standards. All co ntrol measures relate solely to compliance with human -rights and environment -related obligations.
1.10.5 Participation in training courses
If GIZ identifies compliance risks related to the Code of
Conduct, the contractor is obliged at GIZ’s request to take part in training courses carried out by GIZ to ensure compliance with the Code of Conduct and to ensure that the Code is adequately applied in the extended supply chain. Participation is not necessary if GIZ agrees and if the contractor confirms in writing to GIZ that it (i) complies with the provisions of the
Code of Conduct and (ii) verifiably conducts its own training courses.
1.10.6 Obligations to provide information and documents
The contractor is obliged on request to procure and provide the information and documents GIZ needs in order to meet all of the regulatory requirements resulting from the contractual relationship, for example requirements related to the German
PUBLIC
Updated: December 2024 Page 3
Federal Act on Corporate Due Diligence Obligations in Supply
Chains (LkSG).
1.10.7 Legal consequences in the event of violations of the Code of Conduct
If the contractor breaches any of the obligations set out in the
Code of Conduct, GIZ is entitled to suspend performance of the contract or terminate the contract if the breach is not remedied after setting a reasonable deadline. There is no need to set a deadline in the event of a serious, persisting or repeated breach. If GIZ terminates the contract for this reason, the contractor shall be deemed responsible for the termination. If the contractor breaches an obligation under the
Code of Conduct, the contractor is additionally obliged to pay damages unless it can prove that it is not responsible for the breach. The payment of damages also includes appropriate compensation for reputational damage.
If the contractor breaches an obligation under the Code of
Conduct, GIZ is furthermore entitled to exclude the contractor from future competitive award procedures for as long as the breach persists and to the extent appropriate.
The contractor is obliged to pay a contractual penalty for each breach of the Conflicts of Interest (4.1) and the Integrity
Principles (4.2); the amount of this penalty (i) depends on the nature and severity of the breach, (ii) is established by GIZ after due consideration and (iii) shall not exceed EUR 50,000.
If a pecuniary advantage granted by the contractor as a form of bribery is greater than EUR 50,000, the contractor must pay a contractual penalty equal to this sum. Any further rights to claim damage s on the part of GIZ shall remain unaffected.
However, contractual penalties that have already been paid shall be deducted from such claims for damages.
1.11 Agreements under international law and implementation agreements
The contractor is obliged to comply with the applicable stipulations of the respective agreements under international law (general agreements on technical cooperation, exchanges of notes) between the Federal Republic of Germany and the country of assignment and, if applicable, any implementation agreements between the project executing agency and GIZ.
2. Provision of work and services by the contractor
2.1 Assignment of experts
The contractor shall ensure that it and any experts it assigns possess the appropriate professional and personal qualifications needed to complete the stipulated tasks successfully.
The contractor is responsible for ensuring that the experts it assigns comply with the relevant provisions set out in the contract and have been adequately informed about the contractual provisions on information security.
2.2 Protective measures, health requirements and necessary insurance policies
The contractor shall be responsible for ensuring that it and the experts it assigns meet the health requirements for the country of assignment. The contractor is in particular obliged to arrange the necessary vaccinations. The contractor must ensure adequate insurance cover (in particular health, repatriation and accident insurance). The contractor must provide evidence of compliance with this provision if requested by GIZ.
GIZ will accept no liability for property damage, sickness, personal injury or death in respect of the contractor or the experts assigned by the contractor to the project, or for the consequences thereof.
2.3 Cooperation with other institutions
The contractor and the assigned experts are obliged to cooperate with the German mission abroad, specialists working in the country of assignment and the representatives of the Federal Republic of Germany working in the country of assignment, and also – where relevant for (contract) performance – with representatives and experts of multilateral and other organisations.
2.4. Force majeure
Force majeure is an unavoidable event (e.g. natural disaster, outbreak of disease or an epidemic, serious unrest, war or terrorism) that no human foresight or experience could anticipate, that cannot be evaded or overcome by applying economically reasonabl e means or taking utmost care and that prevents or impedes one party to the contract from fulfilling their contractual obligations. If an event originates from the sphere of responsibility of one of the parties to the contract, this shall not constitute force majeure.
In the event of force majeure, the contractual obligations, insofar as they are affected by the event in question, shall be suspended for as long as it remains impossible to render the services because of this situation, provided that one party to the contract notifies the other party to the contract about the force majeure event without undue delay. In this case, the contractor is obliged to take all measures to keep the expenses resulting from the force majeure event as low as possible and to document them.
If the provision of services becomes permanently impossible due to the force majeure event or if the force majeure event persists for longer than three months, both parties to the contract are entitled to terminate the contract without further notice. This shall not affect GIZ’s rights of termination as set out in Section 4.3.
In the event of interruption or termination as a result of force majeure, the services rendered and all proven, necessary and unavoidable expenses incurred by the contractor shall be invoiced in accordance with the contract prices. GIZ may refuse to reimbu rse expenses in accordance with this provision if the contractor fails to provide GIZ with sufficient evidence
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH