The tender has closed (11/12/2025). Current tenders
Tender
TENDER [procurement of occupational tools and equipment]
From the attached document
Tender Announcement
Project Name: Wellbeing of Women in Aserbaidschan
Project Number: 23.4067.7-002.00
Ladies and Gentlemen,
On behalf of the Federal Government of Germany, Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)
We intend to procure Occupational Tools and Equipment from a locally registered company in accordance with the attached technical specifications for detailed information please refer to Annex 1.
Should you be interested in supplying the goods shown in the attached specifications, we request you to submit a bid via e-mail to arrive at the
GIZ no later than 12.11.2025 23:59. Please address your bid exclusively to to the following E-mail: ge_quotation@giz.de
Offers submitted after the submission deadline will not be considered.
The offer shall be submitted in English.
Bids must be submitted in EUR, bids in other currencies will not be accepted.
The offer shall consist of the following documents:
The price offer stating name of the manufacturer, model, the unit price and total price of the offered equipment for each Lot.
Technical documentation of equipment offered. (Information about the technical specifications).
Filled in and signed Self-declaration (Annex 3)
Griboedov Str 31a • 0108 Tbilisi • Georgien
Deutsche Entwicklungszusammenarbeit
GIZ Büro Tbilisi
Griboedov Str 31a 0108 Tbilisi, Georgien
T +995322201800
F
Ihr Zeichen
Unser Zeichen
28.10.2025
Deutsche Gesellschaft für
Internationale Zusammenarbeit (GIZ) GmbH
Sitz der Gesellschaft Bonn und Eschborn
Friedrich-Ebert-Allee 32 + 36 53113 Bonn, Deutschland
T +49 228 4460-0
F +49 228 4460-1766
Dag-Hammarskjöld-Weg 1 - 5 65760 Eschborn, Deutschland
T +49 6196 79-0
F +49 6196 79-1115
E info@giz.de
I www.giz.de
Amtsgericht Bonn
Eintragungs-Nr. HRB 18384
Amtsgericht Frankfurt am Main
Eintragungs-Nr. HRB 12394
Vorsitzender des Aufsichtsrats
Staatssekretär Niels Annen
Vorstand
Thorsten Schäfer-Gümbel (Vorstandssprecher)
Ingrid-Gabriela Hoven
Anna Sophie Herken
Seite 2/4, 28.10.2025
You are requested to comply with the following requirements when submitting offers electronically:
Bids must be submitted in PDF-format.
Following tender number must be indicated in the subject line of the e-mail:
91191695. Otherwise, your bid cannot be identified.
Any bids that are submitted to other GIZ email accounts will be excluded from the contract award procedure.
The size of emails for quotation is limited to 20 MB. In case the offer exceeds the maximum data size, offer documents must be sent via following website: https://filetransfer.giz.de/Start?2 . GIZ accepts only this specific file transfer solution for submission of documents exceeding the default mail size.
GIZ is not responsible for the failure of electronic delivery of e-mail messages to the address provided, either for technological problems on the part of GIZ or the candidate
Following information must be indicated in the offer:
Number of LOT applying for (Bids may be submitted for all lots or only for single lot.)
Name of the company
Tax ID
Contact information (Address, phone, e-mail)
Name of the Tender: Occupational Tools and Equipment
Project number: 23.4067.7-002.00
Tender Number: 91191695
Submitted proposals should be stamped (if available) and signed by the tenderer.
The offer should include also following information:
Order execution deadlines
Validity of the offer
Seite 3/4, 28.10.2025
Assessment confirming compliance with embargoes and other trade restrictions currently in place
Before entering into any contract, GIZ reserves the right to ascertain the origin of the goods offered. This assessment will be conducted to ensure compliance with embargoes and other trade restrictions in place within the scope of GIZ’s due diligence. This is particularly true of the EU sanctions against Russia, Belarus,
Crimea and the affected parts of Eastern Ukraine1 currently in place (primarily the
EU Council Regulations No.: 833/2014 and 765/2006).
By submitting their bid, the bidder undertakes towards GIZ the responsibility that in the event of a probable award, the bidder will provide all necessary support to enable GIZ to ensure compliance with the sanctions regime – this assurance is thus given prior to the award of any contract. This includes in particular the obligation, if so requested by GIZ, to complete a self-declaration to determine the origin of the goods offered and/or to provide GIZ with the required evidence of the origin of such goods. Should the bidder fail to meet these obligations or fail to do so within a reasonable period of time, this can result in their bid being excluded.
A contract can only be awarded on completion of this assessment of the origin of the goods offered. Should this check give grounds for concern or reveal facts that constitute a contractual impediment, GIZ shall inform the bidder without delay.
GIZ shall also reserve the right in such cases to award the contract to the nextranked bidder in the competitive tender procedure.
Other Terms:
Desired delivery time: Delivery within 14 days of order placement, so please offer the shortest delivery time possible
Offer validity period: not less than 30 days.
Place of delivery: Binagadi Baku, Binagadi, Khojasan, Vusal Maharramov street 1
Address: 75, Rasul Rza street, office no. 202. GIZ Office Baku, Winter Park
Plaza. AZ 1014, Baku, Azerbaijan. Samir Abbasov, Kamran Hummatov
Payment: Within 10 working days after delivery of the goods and the original invoice.
1 https://finance.ec.europa.eu/eu-and-world/sanctions-restrictivemeasures/sanctions-adopted-following-russias-military-aggression-againstukraine_en#sanctions
Seite 4/4, 28.10.2025
If you have any further questions in the connection with the tender, please send your question at least 2 days before the closing date for the submission of offers to the following e-mail: ge_quotation@giz.de, with the following subject:
91191695-Question.
In case of violation of the rules, your offer cannot be discussed.
The evaluation of the offers is scheduled to be completed by 19.11.2025. We will then contact only the selected candidate as soon as possible.
By submitting your offer, you confirm that you have read and accepted the
General Terms of Procurement (Annex 2). These will form part of the contract when the contract is awarded to the selected tenderer.
Kind regards,
Procurement Unit
Annexes:
1. Technical Specifications and quantities 2. General Terms of Procurement 3. Self-declaration
Category Item Quantity Specification
Cleaning
Vacuum Cleaner (with HEPA filter) 1
≥1200W; suction ≥18 kPa;
capacity ≥3 L; HEPA H13 washable; cord ≥6 m;
floor/upholstery tools.
Cleaning
Soft Mop with
Bucket 1
Microfiber head ≥40 cm;
telescopic handle 100–140 cm;
bucket ≥12 L with wringer and pour spout.
Cleaning Telescopic Mop 1 Alu/steel handle 90–150 cm;
head ≥40 cm; 360° swivel joint.
Cleaning
Microfiber
Cloths (10 pcs) 1 Size ≥30×30 cm; GSM ≥300;
lint‑free; machine‑washable
≥200 cycles.
Cleaning
Telescopic Dust
Brush 1 Reach 70–150 cm; antistatic microfiber head; washable;
flexible neck.
Cleaning
Hand Brushes and Broom 1 Set: broom + hand brush + dustpan; PET/PP bristles; sturdy handle.
Cleaning Steam Cleaner 1 Boiler ≥1500W; pressure ≥3 bar;
tank ≥1.0 L; safety cap;
floor/window/nozzle kit.
Cleaning
Glass Cleaning
Tool 1 Squeegee ≥30 cm; rubber blade
+ microfiber washer; telescopic pole up to 2 m.
Cleaning
High-Pressure
Water Spray 1 Electric washer; 110–140 bar; ≥6
L/min; hose ≥5 m; auto‑stop.
Cleaning
Disinfectant
Spray Nozzles 1 Chemical‑resistant; adjustable mist/jet; 28/410 neck; ≥0.8 ml/spray.
Cleaning Starter kit 1
Multi‑surface, glass, floor, bathroom concentrates + PPE (nitrile gloves, mask, goggles);
SDS included.
Cleaning
Carpet and upholstery washing machine 1
Extraction type; clean/dirty tanks ≥10/10 L; vacuum ≥20 kPa; pump ≥1 bar;
floor+upholstery tools.
LOT 1 Cleaning Supplies
Category Item Quantity Specification
Hairdressing
Barber Chairs (for haircutting and coloring) 2
Hydraulic lift; load ≥150 kg;
reclining back; headrest & footrest; easy‑clean PU/PVC upholstery.
Hairdressing Mirrors 2 Wall mirrors ≥70×100 cm;
tempered glass; anti‑corrosion backing; mounting kit.
Hairdressing
Lighting
Equipment 2 LED panels/ring; CRI ≥90;
3000–5600 K; ≥2500 lm; stands included.
Hairdressing
Storage Shelves and Cabinets 2 Powder‑coated steel/laminate;
≥3 shelves; lockable cabinet section.
Hairdressing
Hair Washing
Sink with Chair 1 Ceramic basin with mixer & sprayer; tilt; neck rest; drain trap.
Hairdressing Sterilizer 1 UV‑C cabinet (254 nm ≥8 W) or dry‑heat 160–180°C; timer;
stainless interior.
Hairdressing
Hair Dryer (professional, strong airflow) 2 1800–2200 W; ≥70 m³/h airflow; 2 heat/2 speed + cool; 2 nozzles.
Hairdressing
Hair
Straightener 2 Ceramic/tourmaline plates ≥25 mm; 140–230°C; auto‑off; 360° cable.
Hairdressing Curling Iron 2 Barrel 19–25 mm; 120–210°C;
clamp; cool tip; stand.
Hairdressing
Haircutting
Scissors (regular) 2 5.5–6.0"; Japanese steel (J2/440C); adjustable tension;
case.
Hairdressing
Haircutting
Scissors (thinning) 2 5.5–6.0"; 25–35 teeth; same steel; ergonomic handle.
Hairdressing
Combs (flat and round) 4 Anti‑static cutting combs + round styling combs;
heat‑resistant.
Hairdressing
Brushes (flat and round) 4 Paddle + 2 round (Ø25/45 mm);
ceramic‑ionic; heat‑resistant.
LOT 2 Hairdressing
Category Item Quantity Specification
Confectionery
Workshop
Planetary Mixer (20–30 L) 1
Bowl 20–30 L;
whisk/beater/hook; ≥3 speeds;
stainless bowl & guard; 220–240
V.
Confectionery
Workshop
Convection
Oven 1 Electric; ≥4 trays GN1/1 or 600×400; fan‑assisted;
30–250°C; double‑glazed door.
Confectionery
Workshop Dough Sheeter 1 Belt width ≥450 mm; thickness 0.5–30 mm; safety guards;
tabletop/floor.
Confectionery
Workshop
Refrigerated
Display Case 1 Volume ≥300 L; +2…+8°C; forced air; LED; double‑glazed;
auto‑defrost.
Confectionery
Workshop
Chocolate
Tempering
Machine 1 Capacity ≥3 kg; 27–50°C; ±0.5°C thermostat; stainless bowl.
Confectionery
Workshop
Packaging
Machine 1 Tabletop sealer/shrink or flow‑pack; sealing width ≥300 mm; stainless surface.
Confectionery
Workshop
Hand Tools and
Accessories 1
Spatulas, scrapers, piping bags
& tips, pastry rings, thermometers, silicone mats;
food‑grade.
Confectionery
Workshop Weighing Scale 1 Digital; capacity ≥15 kg;
accuracy 1–2 g; tare; stainless platform.
LOT 3 Confectionery
Category Item Quantity Specification
Sewing &
Tailoring
Fabric (various types) 1 Cotton/poly/linen; width ≥140 cm; colorfast; 120–250 gsm mix.
Sewing &
Tailoring
Thread (assorted colors) 1 100% polyester; cones ≥500 m;
Tex ≥27; colorfast.
Sewing &
Tailoring
Scissors (fabric
& thread) 1 Fabric shears 8–10" + thread snips; hardened steel;
ergonomic.
Sewing &
Tailoring
Mannequins (adjustable) 1 Adjustable bust/waist/hip;
height‑adjustable stand;
pinnable surface.
Sewing &
Tailoring Ironing Board 1 ≥120×38 cm; height‑adjustable;
mesh surface; cotton cover; iron rest.
Sewing &
Tailoring Steam Iron 1 ≥2000 W; steam ≥35 g/min;
burst ≥120 g; anti‑calc; tank
≥300 ml.
Sewing &
Tailoring Cutting Table 1 ≥150×90 cm; laminated top;
sturdy frame; ruler grid preferred.
Sewing &
Tailoring
Storage
Shelves/Cabinet s 1 Metal/laminate; ≥3 shelves; ≥40 kg/shelf; lockable option.
Sewing &
Tailoring
Measuring
Tapes & Rulers 1 Tape 150 cm (metric both sides); rulers 30/60 cm;
L‑square.
Sewing &
Tailoring
Pins, Needles, and Pincushions 1 Glass‑head pins ≥200 pcs; mixed hand/machine needles;
pincushion.
Sewing &
Tailoring
Tailor’s chalk and markers 1 Chalk (assorted) + air/water‑erasable markers;
non‑staining.
Sewing &
Tailoring
Sewing kits (basic) 1 Needles, assorted threads, buttons/snaps, thimble, seam ripper, tape, small scissors; box.
LOT 4 Sewing
Category Item Quantity
Shelter Beds (single) 50
Shelter
Bed linen sets (single) 50
Single bed set: frame + mattress; size 90×200 cm; metal or solid-wood frame; load ≥120 kg; anti-rust coating;
non‑toxic finishes; mattress medium‑firm, foam/spring
≥18 cm; 12‑month warranty; assembly kit included.
Set per bed: 1 fitted sheet + 1 flat sheet + 1 pillowcase;
single size for 90×200 cm mattress; 100% cotton or cotton‑rich (≥120–150 gsm); colorfast;
machine‑washable ≥60°C; OEKO‑TEX or equivalent safety standard.
Specification
LOT 5 Shelter
1
General Purchase Conditions (Local):
- as at March 2023 - for supplying services, materials and equipment on behalf of the Deutsche
Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in Georgia
1. Applicability, Components of the Contract 1.1. Applicability of the General Purchase Conditions
Subject to Section 1.2, these General Purchase Conditions apply to all goods and services supplied by the Contractor to the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH as the contracting party.
The Contractor must prepare its tender based on these
General Purchase Conditions. A contract is established between the parties, subject exclusively to GIZ's General
Purchase Conditions, once an order is issued by GIZ, after which any amendments to the contract require the approval of
GIZ in text form. Any general terms and conditions of business and/or payment specified by the Contractor and attached to the latter's order confirmation or made available in any other way do not apply unless GIZ has expressly agreed to them in advance in text form. GIZ's General Purchase Conditions apply even if GIZ accepts the goods and/or services in full knowledge of, and without objecting to, any conflicting or differing conditions of the Contractor.
1.2 Components of the contract
The contract is made up exclusively of the following components:
1) GIZ's written order with all annexes thereto; 2) the technical tender submitted by the Contractor, excluding any general terms and conditions of business and/or payment attached by the Contractor; 3) these General Purchase Conditions; 4) the
Code of Conduct for Contractors of GIZ. In the event of discrepancies between individual components of the contract, the documents listed above apply in the given order.
2. Procedures governing Supply, Performance and Transport 2.1 Packing and marking
All items must be packed and where appropriate marked in accordance with the specific requirements for the goods, the type of shipment, the form of transport and the legal and climatic conditions in Georgia. Subject to these packing specifications, the Contractor must, wherever possible, use eco-friendly and easily recyclable packaging. Items should be packaged using only the minimum amount of material required.
The Contractor is liable for correct packing and marking and for any damage attributable to inadequate or defective packing or marking. If third parties are engaged by the Contractor to carry out packing/marking, the Contractor shall be liable for their faults. GIZ or the forwarding agent contracted by GIZ is entitled but not obliged to refuse packages which do not comply with the above conditions or to demand subsequent performance by the Contractor (remedy or replacement) or, if the Contractor fails to provide subsequent performance within the stipulated period, to remedy the deficiencies itself or arrange for the deficiencies to be remedied or procure a replacement, in all cases at the expense of the Contractor.
2.2 Delivery terms
'Delivery terms' means the Incoterms agreed in the contract, any amended or supplemented Incoterms in their amended or supplemented form, or, where no Incoterms have been agreed, any other individually agreed delivery terms.
2.3 Delivery documents
The term 'delivery documents' means the documents listed under this Section 2.3. and in the order, as well as all other accompanying documents which are required in order to deliver the goods to the location of use without any trouble or interruption in accordance with the respective conditions.
The Contractor must make the delivery documents available at the required point in time, at the latest when the goods are handed over to GIZ.
In addition to quoting GIZ's order number, the packing list must state the precise content, the gross and net weights and the complete markings of each package. An additional copy of the list must be included in each package.
2.4 Additional documents
The technical inspection certificates or official approval or registration certificates or certificates of origin or similar certificates specified in detail in GIZ's written order must be delivered to GIZ at the latest together with the delivery documents.
Two copies each of the operating instructions and any necessary assembly instructions, in Georgian and English, must be delivered together with the goods. If additional foundation layout plans and circuit diagrams are required in order to prepare for installations, such documents are to be submitted to GIZ in duplicate, quoting GIZ's order number, as soon as the written order has been received.
2.5 Transport
If the Contractor is responsible for transport, any assistance with the transport of consignments which is provided by GIZ or the recipient of the goods or services in Georgia does not release the Contractor from its obligation to ensure the proper transport of these to the place of delivery.
2.6 Partial deliveries
Partial deliveries require GIZ's prior consent in text form. They must be identified as such in all shipping and delivery documents and in the marking on the packages and must be consecutively numbered.
2
2.7 Delivery dates
Goods and/or services may be delivered before the agreed date only with the prior consent of GIZ, in text form.
3. Payment Terms and Prices 3.1 Prices
The agreed prices are fixed prices and exclude any subsequent claims by the Contractor for additional payment and any price increases of any kind. The prices include all packing costs, ancillary costs, costs for drawing up or obtaining the delivery documents specified in Section 2.3 and the additional documents specified in Section 2.4, transport costs, assembly, installation, all customary accessories and any accessories required in order to prepare the items for use or operation.
The Contractor undertakes to make use of any possible exemption from value-added tax. If and insofar as goods and services are subject to value-added tax, the Contractor must show the tax separately in the invoice.
3.2 Payment terms and assignment 3.2.1 Due date
The purchase price is payable by the contractually agreed payment date following receipt by GIZ of a proper itemised commercial invoice (Section 3.2.2), the delivery documents specified in Section 2.3 and the additional documents specified in Section 2.4. If advance payments or partial payments are agreed, payment must be made within the agreed periods and upon presentation of the agreed documents and collateral.
If partial deliveries are made without the prior consent required under Section 2.6, the total purchase price is not due until the payment conditions are met for the goods and services as a whole, including the final partial delivery or final partial service.
3.2.2 Commercial invoice and evidence of shipment
The commercial invoice must be made out to GIZ and must quote GIZ's full order number. A separate commercial invoice must be made out for each shipment. If advance payments are agreed, they must be invoiced in the commercial invoice against which an advance payment is offset, and deducted once more from the overall amount.
3.2.3 Assignment
Claims against GIZ may be assigned only with the written form.
3.2.4 Offsetting claims and rights of retention
The Contractor may offset only such claims as are undisputed or established as having legal force. GIZ is entitled to exercise the offsetting rights and rights of retention available to it under law.
4. Transfer of Risk and of Ownership
Performance risks are transferred in accordance with the delivery terms (as defined in Section 2.2 above) but no later than the point at which ownership of the goods is transferred from the
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
303 announcements
Winter Park Plaza 75, Rasul Rza street, office no.202, Baku
http://www.giz.de/giz-aserbaidschan@giz.de(99412) 599 91 20These are the organisation's own contacts. AZERWEB.AZ only publishes its announcements.
View Company Profile