The tender has closed (11/10/2025). Current tenders
From the attached document
# Description Unit Quantity 1 2 3 4 1 1.1
Laptop (83DV014PRK) CPU:Intel Corei7-13650HX
RAM:32Gb DDR5 SSD:1TB NVMe M.2
Screen:15.6"IPS 144Hz VGA:nVidia RTX4050 6Gb pcs 2 1.2
Laptop (FX608MJR-RV037, M002S0) CPU:Intel
Corei7-14650HX RAM:16Gb DDR5 SSD:1TB
NVMe M.2 Screen:15.6"IPS 165Hz VGA:nVidia
RTX5060 8Gb pcs 2 1.3 Printer Multifunction Wi-Fi Ink Tank A4 Printer, With
Up To 3 Years Of Ink Included pcs 3 1.4 Tablet 8GB/256GB Graphite Gray pcs 6 1.5 Wireless Mouse pcs 8 1.6 Multifunctional Printer Color LaserJet MFP pcs 4 1.7 Projector pcs 2 1.8 SD Card microSD SDCS2/64Gb pcs 2 1.9 External HDD Expansion 2.5" 2TB USB 3.0 pcs 2 1.10 Protector DFS 751 1.8m, 2*USB, 2.1A pcs 3 1.11 Flash card DataTraveller DTX/128Gb USB pcs 10 2 2.1
TV (diagonal 55" (140 cm); screen resolution 4K
UHD (3840 × 2160); HDR10, HDR10+) pcs 3 2.2 Sewing machine (power 65 W; Electromechanical)pcs 2 2.3
Electronic board (IQ BOARD Weight 56Kg±1Kg
Power supply AC 100-240V, 50/60Hz Speakers 15W*2 Diagonal 75" Response time <4ms (single touch), <6ms. maximum touch input) pcs 2 2.4
Dishwasher (Water consumption: 12.9 lt; Noise level: 49 db; With cutlery basket; With display;
Electronic control type; Leak protection;
Dimensions: 85x60x60 cm
Weight: 42 kg) pcs 2 2.5 Robot vacuum cleaner pcs 3 2.6
Electronic Scale Measuring Height and Weight (Material: Plastic and Metal; Load Capacity: Max 150-200 Kg; Height Measurement: 70-190 cm) pcs 1 2.7
Clothes Dryer LG RH80T2SP7RM (Functions:
Jeans, Normal Drying, Delay Start, Gentle Drying,
Easy Ironing, Anti-Crease, Quick Drying; Maximum
Drying Load: 8 kg.) pcs 1 2.8
Electric Samovar Tea Vending Machine (10 liters - 900 W powerful, 40 cup capacity, stainless steel body, automatic thermostat and 24-hour warm keeping function, single and double tap) pcs 1 2.9
Above ground pool (Class: oval pool with frame;
length 610 cm; width 366 cm; height 122 cm;
volume (90%): 20241 lt) pcs 1 2.10 Voltage regulator 100kVA 3 phase 275-450v cabinet pcs 1 2.11 Air condisioner 50-60m², Inventer, White pcs 3 2.10 Freezer (BD (W)- 520 BL) pcs 3 2.11 Water filter (HerbaWater) pcs 2 2.12 Generator (60 kVA/48 kW) pcs 1
List of Office and other Technical Equipment
Office Equipment
Total
Other Technical Equipment
1
General Purchase Conditions (Local):
- as at March 2023 - for supplying services, materials and equipment on behalf of the Deutsche
Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in Georgia
1. Applicability, Components of the Contract 1.1. Applicability of the General Purchase Conditions
Subject to Section 1.2, these General Purchase Conditions apply to all goods and services supplied by the Contractor to the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH as the contracting party.
The Contractor must prepare its tender based on these
General Purchase Conditions. A contract is established between the parties, subject exclusively to GIZ's General
Purchase Conditions, once an order is issued by GIZ, after which any amendments to the contract require the approval of
GIZ in text form. Any general terms and conditions of business and/or payment specified by the Contractor and attached to the latter's order confirmation or made available in any other way do not apply unless GIZ has expressly agreed to them in advance in text form. GIZ's General Purchase Conditions apply even if GIZ accepts the goods and/or services in full knowledge of, and without objecting to, any conflicting or differing conditions of the Contractor.
1.2 Components of the contract
The contract is made up exclusively of the following components:
1) GIZ's written order with all annexes thereto; 2) the technical tender submitted by the Contractor, excluding any general terms and conditions of business and/or payment attached by the Contractor; 3) these General Purchase Conditions; 4) the
Code of Conduct for Contractors of GIZ. In the event of discrepancies between individual components of the contract, the documents listed above apply in the given order.
2. Procedures governing Supply, Performance and Transport 2.1 Packing and marking
All items must be packed and where appropriate marked in accordance with the specific requirements for the goods, the type of shipment, the form of transport and the legal and climatic conditions in Georgia. Subject to these packing specifications, the Contractor must, wherever possible, use eco-friendly and easily recyclable packaging. Items should be packaged using only the minimum amount of material required.
The Contractor is liable for correct packing and marking and for any damage attributable to inadequate or defective packing or marking. If third parties are engaged by the Contractor to carry out packing/marking, the Contractor shall be liable for their faults. GIZ or the forwarding agent contracted by GIZ is entitled but not obliged to refuse packages which do not comply with the above conditions or to demand subsequent performance by the Contractor (remedy or replacement) or, if the Contractor fails to provide subsequent performance within the stipulated period, to remedy the deficiencies itself or arrange for the deficiencies to be remedied or procure a replacement, in all cases at the expense of the Contractor.
2.2 Delivery terms
'Delivery terms' means the Incoterms agreed in the contract, any amended or supplemented Incoterms in their amended or supplemented form, or, where no Incoterms have been agreed, any other individually agreed delivery terms.
2.3 Delivery documents
The term 'delivery documents' means the documents listed under this Section 2.3. and in the order, as well as all other accompanying documents which are required in order to deliver the goods to the location of use without any trouble or interruption in accordance with the respective conditions.
The Contractor must make the delivery documents available at the required point in time, at the latest when the goods are handed over to GIZ.
In addition to quoting GIZ's order number, the packing list must state the precise content, the gross and net weights and the complete markings of each package. An additional copy of the list must be included in each package.
2.4 Additional documents
The technical inspection certificates or official approval or registration certificates or certificates of origin or similar certificates specified in detail in GIZ's written order must be delivered to GIZ at the latest together with the delivery documents.
Two copies each of the operating instructions and any necessary assembly instructions, in Georgian and English, must be delivered together with the goods. If additional foundation layout plans and circuit diagrams are required in order to prepare for installations, such documents are to be submitted to GIZ in duplicate, quoting GIZ's order number, as soon as the written order has been received.
2.5 Transport
If the Contractor is responsible for transport, any assistance with the transport of consignments which is provided by GIZ or the recipient of the goods or services in Georgia does not release the Contractor from its obligation to ensure the proper transport of these to the place of delivery.
2.6 Partial deliveries
Partial deliveries require GIZ's prior consent in text form. They must be identified as such in all shipping and delivery documents and in the marking on the packages and must be consecutively numbered.
2
2.7 Delivery dates
Goods and/or services may be delivered before the agreed date only with the prior consent of GIZ, in text form.
3. Payment Terms and Prices 3.1 Prices
The agreed prices are fixed prices and exclude any subsequent claims by the Contractor for additional payment and any price increases of any kind. The prices include all packing costs, ancillary costs, costs for drawing up or obtaining the delivery documents specified in Section 2.3 and the additional documents specified in Section 2.4, transport costs, assembly, installation, all customary accessories and any accessories required in order to prepare the items for use or operation.
The Contractor undertakes to make use of any possible exemption from value-added tax. If and insofar as goods and services are subject to value-added tax, the Contractor must show the tax separately in the invoice.
3.2 Payment terms and assignment 3.2.1 Due date
The purchase price is payable by the contractually agreed payment date following receipt by GIZ of a proper itemised commercial invoice (Section 3.2.2), the delivery documents specified in Section 2.3 and the additional documents specified in Section 2.4. If advance payments or partial payments are agreed, payment must be made within the agreed periods and upon presentation of the agreed documents and collateral.
If partial deliveries are made without the prior consent required under Section 2.6, the total purchase price is not due until the payment conditions are met for the goods and services as a whole, including the final partial delivery or final partial service.
3.2.2 Commercial invoice and evidence of shipment
The commercial invoice must be made out to GIZ and must quote GIZ's full order number. A separate commercial invoice must be made out for each shipment. If advance payments are agreed, they must be invoiced in the commercial invoice against which an advance payment is offset, and deducted once more from the overall amount.
3.2.3 Assignment
Claims against GIZ may be assigned only with the written form.
3.2.4 Offsetting claims and rights of retention
The Contractor may offset only such claims as are undisputed or established as having legal force. GIZ is entitled to exercise the offsetting rights and rights of retention available to it under law.
4. Transfer of Risk and of Ownership
Performance risks are transferred in accordance with the delivery terms (as defined in Section 2.2 above) but no later than the point at which ownership of the goods is transferred from the Contractor to GIZ.
Unless otherwise agreed, ownership of the goods shall be transferred from the Contractor to GIZ at whichever of the times listed below occurs first: transfer of risk or full payment of the purchase price (with the exception of any agreed share for assembly/installation or work and materials and any agreed warranty retention amount). If, at that time, the goods have not yet been delivered, the Contractor must hold the goods in safekeeping for GIZ free of charge and/or hereby assigns to GIZ any present and future claims against third parties to the surrender of the goods.
Retention of title to the goods (in case the contractor does not transfer the ownership to GIZ until the full price is paid) must be agreed by both parties in text form in a separate document.
Parts or tools made available by GIZ or by the recipient named in the contract remain the property of either GIZ or the recipient. Any processing or alterations by the Contractor are carried out on behalf of GIZ or the named recipient.
5. Breaches of Contract, Warranty, Default and
Liability 5.1 Default
The Contractor is in default if it does not provide the service owed by the contractually agreed delivery date. If the
Contractor is in default, GIZ is entitled to all statutory claims without limitation. If the Contractor is in default, GIZ is entitled to impose a contractual penalty amounting to 0.2 per cent of the agreed purchase price per calendar day, up to a maximum of 5 per cent of the agreed purchase price (including packing and freight costs, plus value-added tax where applicable). GIZ is entitled to claim a contractual penalty up to the time at which the goods are received and/or the services are provided properly and fully. The contractual penalty will be deducted from more extensive claims for damages.
5.2 Warranty and assurances
The goods and services to be provided must comply with the generally acknowledged rules of technology. They must be of excellent quality. The Contractor warrants that all goods and services are free from defects and that they fulfil the characteristics as agreed in the contract. Unless otherwise specified by GIZ in text form, all goods must be new.
In the case of a contract for work and materials, the Contractor warrants that the materials used (with the exception of materials provided by GIZ) and the manufacture, construction and planning (with the exception of manufacture, construction and planning activities performed by GIZ) are free of defects and fulfil the agreed characteristics.
The Contractor also warrants that the goods and services are suitable for use at the location of use with due regard for the local climatic, technical and legal conditions and that they meet all the relevant technical standards (for example, EN,
ISO, DIN, and VDE). The location of use of the goods is specified in GIZ's written order or, if the location of use is not explicitly stated, it is Tbilisi.
The Contractor warrants that the goods and services have no defects of title and do not breach any copyrights, industrial or intellectual property rights or any other rights of third parties.
3
5.3 Claims for defects
In case of defects, GIZ is entitled as a minimum to assert all its statutory rights.
In the event of disagreement over whether goods and services are defective, the Contractor bears the burden of proof for demonstrating that the said goods or services are free of defects.
GIZ is also entitled to assert claims for damage incurred by the user of the goods and services which arise due to defects or to failure on the part of the Contractor to comply with other contractual obligations.
The defects liability period for asserting warranty or other compensation claims in respect of goods which have been repaired or replaced commences once again if the Contractor was obliged to render subsequent performance (remedy of the defect, replace of the goods etc). The defects liability period is suspended for the period during which goods or services are unavailable on account of defects.
5.4 Examination of goods and lodging of complaints
To comply with the statutory obligation to examine goods and lodge complaints in respect of defects in due course, it is sufficient if GIZ examines the goods at the location of use. It is sufficient if the inspection is carried out with the resources available at the location of use. In the event of partial deliveries, the goods need not be examined until the final partial delivery has arrived at the location of use. If it is agreed that the goods are to be installed, assembled or placed into operation, GIZ is not required to inspect the goods until these steps have been carried out. If several goods of the same type are delivered, it is sufficient to inspect a random sample of the goods. If random checks reveal defects, GIZ may assert claims for defects in relation to all of such goods and services.
Complaints in respect of defects must be lodged with the
Contractor without undue delay as soon as such defects are discovered. Notice of defects in goods and services is given in good time if lodged within 30 calendar days of whichever of the following occurs latest in each case: 1) arrival at the location of use; 2) completed installation, assembly or commencement of operation. In the case of hidden defects, notice of defect is given in good time if lodged within 15 calendar days of such defects being discovered.
If the Contractor fraudulently conceals a defect, it is not entitled to plead that GIZ breached its obligation to examine the goods and to lodge a complaint in respect of defects. The same applies if the Contractor was unaware of the defect at the time of delivery due to gross negligence.
5.5 Liability
The Contractor is liable for all its own faults and those of persons it uses to fulfil its obligations (vicarious agents) and of manufacturers. The Contractor is also liable for any culpable damage resulting from its actions or those of its vicarious agents even if such damage is merely incidental to the fulfilment of the order.
6. Prevention of the Financing of Terrorism and
Compliance with Embargoes
The Contractor must not use any remuneration obtained from
GIZ in order to provide funds or other economic resources directly or indirectly to third parties which are included on a sanctions list issued by the United Nations and/or the EU.
When implementing the contract, the Contractor may enter into and/or maintain business relations only with third parties which are reliable and to whom no statutory ban on entering into contractual or business relations applies. When implementing the contract, the Contractor must also comply with embargoes and other trade restrictions imposed by the
United Nations, the EU or the Federal Republic of Germany.
The Contractor must notify GIZ without delay and on its own initiative if the Contractor, a member of its official managing body and/or other administrative bodies, its shareholders and/or staff is included on a sanctions list issued by the United
Nations or the EU. This provision also applies if the Contractor becomes aware of an event which leads to such a listing.
The Contractor must notify GIZ without delay and on its own initiative of any violation of the provisions stipulated in this
Section 6. In the event of such a violation, GIZ is entitled to withdraw from or terminate the contract without prior notice.
This does not affect GIZ's rights under Section 8 of these
General Purchase Conditions.
7. Obligations related to the Supply Chain 7.1 Code of Conduct for GIZ Contractors
The Contractor shall guarantee with regard to its own business activities that it acts in accordance with the Code of Conduct for Contractors of the Deutsche Gesellschaft für Internationale
Zusammenarbeit (GIZ) GmbH ('Code of Conduct'), which is annexed to these General Purchase Conditions and is a component of the contract, and warrants that it will appropriately address the provisions of the Code of Conduct along the supply chain if GIZ establishes the existence of a human-rights or environment-related risk and notifies the
Contractor thereof.
The Contractor is obliged to hold GIZ harmless from third-party claims resulting from a breach of the Code of Conduct unless the Contractor can prove that it is not responsible for the breach.
7.2 Preventive measures
The Contractor must take suitable and appropriate measures to prevent and minimise the risk of breaching the provisions of the Code of Conduct. If GIZ identifies (new) risks during performance of the contract, additional preventive measures must be taken. GIZ is entitled to instruct the Contractor to take specific measures.
7.3 Ensuring access to the complaints procedure in the supply chain
The Contractor shall ensure unhindered access for all of its employees to the complaints procedure set up at GIZ. In particular, the Contractor shall not undertake any actions which hinder, prevent or complicate access to the complaints procedure. This also applies to indications that human-rights or environment-related obligations have been violated due to the actions of an indirect supplier.
4
7.4 Warranted controls
GIZ is entitled to check whether the Contractor complies with the provisions of the Code of Conduct if compliance risks have been identified and the Contractor has been informed of them. The corresponding control measures must be appropriate and give due consideration to the Contractor's justified concerns. In particular, control measures include:
comprehensive disclosure; on-site checks by GIZ or a commissioned third party; mandatory certification in line with recognised standards. All control measures are restricted to compliance with expected human-rights and environmentrelated standards.
7.5 Participation in training courses
If GIZ identifies compliance risks related to the Code of
Conduct, the Contractor shall be obliged at GIZ's request to prove that it has taken part in the training courses carried out by GIZ, which aim to ensure compliance with the humanrights and environmen
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
303 announcements
Winter Park Plaza 75, Rasul Rza street, office no.202, Baku
http://www.giz.de/giz-aserbaidschan@giz.de(99412) 599 91 20These are the organisation's own contacts. AZERWEB.AZ only publishes its announcements.
View Company Profile