Skip to content

    The tender has closed (11/14/2024). Current tenders

    Tender

    TENDER [procurement of goods incl. printing service (handbooks, bookmarks, stickers, bags etc.)]

    11/7/2024Deadline: 11/14/2024Baku, Azerbaijan

    From the attached document

    Tender Announcement Project Name: Economic and social participation of vulnerable displaced persons and local population in the South Caucasus (EPIC) Project Number: 17.4061.2-003.00 Ladies and Gentlemen, On behalf of the Federal Government of Germany, Deutsche Gesellschaft für Internaionale Zusammenarbeit (GIZ) We intend to procure Goods (Handbooks, bookmarks, stickers, bags etc) from a locally registered company in accordance with the attached technical specifications for detailed information please refer to Annex 1. Should you be interested in supplying the goods shown in the attached specifications, we request you to submit a bid via e-mail to arrive at the GIZ no later than 14.11.2024 23:59. Please address your bid exclusively to to the following E-mail: ge_quotation@giz.de Offers submitted after the submission deadline will not be considered. The offer shall be submitted in English. Bids must be submitted in EUR, bids in other currencies will not be accepted. The offer shall consist of the following documents:  The price offer stating name of the manufacturer, model, the unit price and total price of the offered equipment.  Technical documentation of offered equipment. (Information about the technical specifications).  Filled in and signed Self-declaration (Annex 3) Griboedov Str 31a • 0108 Tbilisi • Georgien Deutsche Entwicklungszusammenarbeit GIZ Büro Tbilisi Griboedov Str 31a 0108 Tbilisi, Georgien T +995322201800 F Ihr Zeichen Unser Zeichen 07.11.2024 Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Sitz der Gesellschaft Bonn und Eschborn Friedrich-Ebert-Allee 32 + 36 53113 Bonn, Deutschland T +49 228 4460-0 F +49 228 4460-1766 Dag-Hammarskjöld-Weg 1 - 5 65760 Eschborn, Deutschland T +49 6196 79-0 F +49 6196 79-1115 E info@giz.de I www.giz.de Amtsgericht Bonn Eintragungs-Nr. HRB 18384 Amtsgericht Frankfurt am Main Eintragungs-Nr. HRB 12394 Vorsitzender des Aufsichtsrats Staatssekretär Jochen Flasbarth Vorstand Thorsten Schäfer-Gümbel (Vorstandssprecher) Ingrid-Gabriela Hoven Anna Sophie Herken Seite 2/4, 07.11.20244 You are requested to comply with the following requirements when submitting offers electronically:  Bids must be submitted in PDF-format.  Following tender number must be indicated in the subject line of the e-mail: 91184506. Otherwise, your bid can not be identified.  Any bids that are submitted to other GIZ email accounts will be excluded from the contract award procedure.  The size of emails for quotation is limited to 20 MB. In case the offer exceeds the maximum data size, offer documents must be sent via following website: https://filetransfer.giz.de/Start?2 . GIZ accepts only this specific file transfer solution for submission of documents exceeding the default mail size.  GIZ is not responsible for the failure of electronic delivery of e-mail messages to the address provided, either for technological problems on the part of GIZ or the candidate Following information must be indicated in the offer:  Name of the company  Tax ID  Contact information (Address, phone, e-mail)  Name of the Tender : „Printing PR Materials”.  Project number: 17.4061.2-003.00  Tender Number: 91184506 Submitted proposals should be stamped (if available) and signed by the tenderer. The offer should include also following information:  Order execution deadlines  Validity of the offer Seite 3/4, 07.11.20244 Assessment confirming compliance with embargoes and other trade restrictions currently in place Before entering into any contract, GIZ reserves the right to ascertain the origin of the goods offered. This assessment will be conducted to ensure compliance with embargoes and other trade restrictions in place within the scope of GIZ’s due diligence. This is particularly true of the EU sanctions against Russia, Belarus, Crimea and the affected parts of Eastern Ukraine1 currently in place (primarily the EU Council Regulations No.: 833/2014 and 765/2006). By submitting their bid, the bidder undertakes towards GIZ the responsibility that in the event of a probable award, the bidder will provide all necessary support to enable GIZ to ensure compliance with the sanction’s regime – this assurance is thus given prior to the award of any contract. This includes in particular the obligation, if so, requested by GIZ, to complete a self-declaration to determine the origin of the goods offered and/or to provide GIZ with the required evidence of the origin of such goods. Should the bidder fail to meet these obligations or fail to do so within a reasonable period of time, this can result in their bid being excluded. A contract can only be awarded on completion of this assessment of the origin of the goods offered. Should this check give grounds for concern or reveal facts that constitute a contractual impediment, GIZ shall inform the bidder without delay. GIZ shall also reserve the right in such cases to award the contract to the nextranked bidder in the competitive tender procedure. Other Terms:  Desired delivery time: Delivery within 14 days of order placement, so please offer the shortest delivery time possible  Offer validity period: not less than 30 days.  Place of delivery:  Address: 75, Rasul Rza street, office no. 202. GIZ Office Baku, Winter Park Plaza. AZ 1014, Baku, Azerbaijan. Samir Abbasov, Kamran Hummatov  Payment: Within 10 working days after delivery of the goods and the original invoice. 1 https://finance.ec.europa.eu/eu-and-world/sanctions-restrictivemeasures/sanctions-adopted-following-russias-military-aggression-againstukraine_en#sanctions Seite 4/4, 07.11.20244 If you have any further questions in the connection with the tender, please send your question at least 1 days before the closing date for the submission of offers to the following e-mail: ge_quotation@giz.de, with the following subject: 91184506 -Question. In case of violation of the rules, your offer cannot be discussed. The evaluation of the offers is scheduled to be completed by 20.11.2024. We will then contact only the selected candidate as soon as possible. By submitting your offer, you confirm that you have read and accepted the General Terms of Procurement (Annex 2). These will form part of the contract when the contract is awarded to the selected tenderer. Kind regards, Procurement Unit Annexes: 1. Technical Specifications and quantities 2. General Terms of Procurement 3. Self-declaration 1. Handbooks: o Quantity: 100 copies of each handbook (300 in total) o Size: A4 format, approximately 300 pages per handbook o Material: Matte paper, 80-90 GSM for the interior, 300 GSM for the cover o Color: Full-color (both cover and inside pages) o Binding: Perfect binding or equivalent high-quality method o Additional Requirement: The book should include illustrations (provided by GIZ) and clear, high-resolution images. 2. Success stories book: o Quantity: 500 copies o Size: A4 format, 40 pages per handbook o Material: Matte paper, 80-90 GSM for the interior, 250 GSM for the cover o Color: Full-color (both cover and inside pages) o Binding: Perfect binding or equivalent high-quality method o Additional Requirement: The book should include illustrations (provided by GIZ) and clear, high-resolution images. 3. Bookmarks: o Quantity: 500 pieces o Size: 50x150 mm o Material: 300 GSM cardboard o Color: Colorful with illustrations and or quotes 4. Stickers: o Quantity: 1,000 pieces o Size: 50x50 mm o Material: Durable vinyl with a glossy or matte finish, weather-resistant (suitable for both indoor and outdoor use) o Color: Full color with illustrations and/or quotes provided by GIZ 5. Bags (Tote Bags): o Quantity: 200 pieces o Size: 38.10x40.64 cm, handle – 15 cm in diameter o Material: Cotton, durable, with screen-printed design o Color: Single-color print 6. Label pins: o Quantity: 500 pieces o Material: Enamel, soft/hard enamel, approximately 25-30mm in diameter o Design: Custom design provided by GIZ 7. High Quality Printed Pictures: o Quantity: 24 o Material: High-quality photo paper o Size: 80 cm x 50 cm o Design: Based on the photos provided by GIZ, ensuring sharp, high-resolution prints 8. Banner: o Quantity: 1 piece o Size: 1 meter (width) x 2 meters (height) o Material: Heavy-duty PVC or fabric with reinforced edges and grommets for easy hanging; weather-resistant for both indoor and outdoor use o Color: Full-color print with GIZ branding and design provided, ensuring sharp and high-resolution images The company is expected to handle all logistics of printing, quality control, and delivery to GIZ's oƯice in Baku. 1 General Purchase Conditions (Local): - as at March 2023 - for supplying services, materials and equipment on behalf of the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in Georgia 1. Applicability, Components of the Contract 1.1. Applicability of the General Purchase Conditions Subject to Section 1.2, these General Purchase Conditions apply to all goods and services supplied by the Contractor to the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH as the contracting party. The Contractor must prepare its tender based on these General Purchase Conditions. A contract is established between the parties, subject exclusively to GIZ's General Purchase Conditions, once an order is issued by GIZ, after which any amendments to the contract require the approval of GIZ in text form. Any general terms and conditions of business and/or payment specified by the Contractor and attached to the latter's order confirmation or made available in any other way do not apply unless GIZ has expressly agreed to them in advance in text form. GIZ's General Purchase Conditions apply even if GIZ accepts the goods and/or services in full knowledge of, and without objecting to, any conflicting or differing conditions of the Contractor. 1.2 Components of the contract The contract is made up exclusively of the following components: 1) GIZ's written order with all annexes thereto; 2) the technical tender submitted by the Contractor, excluding any general terms and conditions of business and/or payment attached by the Contractor; 3) these General Purchase Conditions; 4) the Code of Conduct for Contractors of GIZ. In the event of discrepancies between individual components of the contract, the documents listed above apply in the given order. 2. Procedures governing Supply, Performance and Transport 2.1 Packing and marking All items must be packed and where appropriate marked in accordance with the specific requirements for the goods, the type of shipment, the form of transport and the legal and climatic conditions in Georgia. Subject to these packing specifications, the Contractor must, wherever possible, use eco-friendly and easily recyclable packaging. Items should be packaged using only the minimum amount of material required. The Contractor is liable for correct packing and marking and for any damage attributable to inadequate or defective packing or marking. If third parties are engaged by the Contractor to carry out packing/marking, the Contractor shall be liable for their faults. GIZ or the forwarding agent contracted by GIZ is entitled but not obliged to refuse packages which do not comply with the above conditions or to demand subsequent performance by the Contractor (remedy or replacement) or, if the Contractor fails to provide subsequent performance within the stipulated period, to remedy the deficiencies itself or arrange for the deficiencies to be remedied or procure a replacement, in all cases at the expense of the Contractor. 2.2 Delivery terms 'Delivery terms' means the Incoterms agreed in the contract, any amended or supplemented Incoterms in their amended or supplemented form, or, where no Incoterms have been agreed, any other individually agreed delivery terms. 2.3 Delivery documents The term 'delivery documents' means the documents listed under this Section 2.3. and in the order, as well as all other accompanying documents which are required in order to deliver the goods to the location of use without any trouble or interruption in accordance with the respective conditions. The Contractor must make the delivery documents available at the required point in time, at the latest when the goods are handed over to GIZ. In addition to quoting GIZ's order number, the packing list must state the precise content, the gross and net weights and the complete markings of each package. An additional copy of the list must be included in each package. 2.4 Additional documents The technical inspection certificates or official approval or registration certificates or certificates of origin or similar certificates specified in detail in GIZ's written order must be delivered to GIZ at the latest together with the delivery documents. Two copies each of the operating instructions and any necessary assembly instructions, in Georgian and English, must be delivered together with the goods. If additional foundation layout plans and circuit diagrams are required in order to prepare for installations, such documents are to be submitted to GIZ in duplicate, quoting GIZ's order number, as soon as the written order has been received. 2.5 Transport If the Contractor is responsible for transport, any assistance with the transport of consignments which is provided by GIZ or the recipient of the goods or services in Georgia does not release the Contractor from its obligation to ensure the proper transport of these to the place of delivery. 2.6 Partial deliveries Partial deliveries require GIZ's prior consent in text form. They must be identified as such in all shipping and delivery documents and in the marking on the packages and must be consecutively numbered. 2 2.7 Delivery dates Goods and/or services may be delivered before the agreed date only with the prior consent of GIZ, in text form. 3. Payment Terms and Prices 3.1 Prices The agreed prices are fixed prices and exclude any subsequent claims by the Contractor for additional payment and any price increases of any kind. The prices include all packing costs, ancillary costs, costs for drawing up or obtaining the delivery documents specified in Section 2.3 and the additional documents specified in Section 2.4, transport costs, assembly, installation, all customary accessories and any accessories required in order to prepare the items for use or operation. The Contractor undertakes to make use of any possible exemption from value-added tax. If and insofar as goods and services are subject to value-added tax, the Contractor must show the tax separately in the invoice. 3.2 Payment terms and assignment 3.2.1 Due date The purchase price is payable by the contractually agreed payment date following receipt by GIZ of a proper itemised commercial invoice (Section 3.2.2), the delivery documents specified in Section 2.3 and the additional documents specified in Section 2.4. If advance payments or partial payments are agreed, payment must be made within the agreed periods and upon presentation of the agreed documents and collateral. If partial deliveries are made without the prior consent required under Section 2.6, the total purchase price is not due until the payment conditions are met for the goods and services as a whole, including the final partial delivery or final partial service. 3.2.2 Commercial invoice and evidence of shipment The commercial invoice must be made out to GIZ and must quote GIZ's full order number. A separate commercial invoice must be made out for each shipment. If advance payments are agreed, they must be invoiced in the commercial invoice against which an advance payment is offset, and deducted once more from the overall amount. 3.2.3 Assignment Claims against GIZ may be assigned only with the written form. 3.2.4 Offsetting claims and rights of retention The Contractor may offset only such claims as are undisputed or established as having legal force. GIZ is entitled to exercise the offsetting rights and rights of retention available to it under law. 4. Transfer of Risk and of Ownership Performance risks are transferred in accordance with the delivery terms (as defined in Section 2.2 above) but no later than the point at which ownership of the goods is transferred from the Contractor to GIZ. Unless otherwise agreed, ownership of the goods shall be transferred from the Contractor to GIZ at whichever of the times listed below occurs first: transfer of risk or full payment of the purchase price (with the exception of any agreed share for assembly/installation or work and materials and any agreed warranty retention amount). If, at that time, the goods have not yet been delivered, the Contractor must hold the goods in safekeeping for GIZ free of charge and/or hereby assigns to GIZ any present and future claims against third parties to the surrender of the goods. Retention of title to the goods (in case the contractor does not transfer the ownership to GIZ until the full price is paid) must be agreed by both parties in text form in a separate document. Parts or tools made available by GIZ or by the recipient named in the contract remain the property of either GIZ or the recipient. Any processing or alterations by the Contractor are carried out on behalf of GIZ or the named recipient. 5. Breaches of Contract, Warranty, Default and Liability 5.1 Default The Contractor is in default if it does not provide the service owed by the contractually agreed delivery date. If the Contractor is in default, GIZ is entitled to all statutory claims without limitation. If the Contractor is in default, GIZ is entitled to impose a contractual penalty amounting to 0.2 per cent of the agreed purchase price per calendar day, up to a maximum of 5 per cent of the agreed purchase price (including packing and freight costs, plus value-added tax where applicable). GIZ is entitled to claim a contractual penalty up to the time at which the goods are received and/or the services are provided properly and fully. The contractual penalty will be deducted from more extensive claims for damages. 5.2 Warranty and assurances The goods and services to be provided must comply with the generally acknowledged rules of technology. They must be of excellent quality. The Contractor warrants that all goods and services are free from defects and that they fulfil the characteristics as agreed in the contract. Unless otherwise specified by GIZ in text form, all goods must be new. In the case of a contract for work and materials, the Contractor warrants that the materials used (with the exception of materials provided by GIZ) and the manufacture, construction and planning (with the exception of manufacture, construction and planning activities performed by GIZ) are free of defects and fulfil the agreed characteristics. The Contractor also warrants that the goods and services are suitable for use at the location of use with due regard for the local climatic, technical and legal conditions and that they meet all the relevant technical standards (for example, EN, ISO, DIN, and VDE). The location of use of the goods is specified in GIZ's written order or, if the location of use is not explicitly stated, it is Tbilisi. The Contractor warrants that the goods and services have no defects of title and do not breach any copyrights, industrial or intellectual property rights or any other rights of third parties. 3 5.3 Claims for defects In case of defects, GIZ is entitled as a minimum to assert all its statutory rights. In the event of disagreement over whether goods and services are defective, the Contractor bears the burden of proof for demonstrating that the said goods or services are free of defects. GIZ is also entitled to assert claims for damage incurred by the user of the goods and services which arise due to defects or to failure on the part of the Contractor to comply with other contractual obligations. The defects liability period for assert
    Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

    Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

    303 announcements

    Winter Park Plaza 75, Rasul Rza street, office no.202, Baku
    http://www.giz.de/giz-aserbaidschan@giz.de(99412) 599 91 20

    These are the organisation's own contacts. AZERWEB.AZ only publishes its announcements.

    View Company Profile

    Share

    Attachments (1)

    All 303 announcements