Tender
TENDER [Short Video production: Videos on climate change impacts on agriculture, adaptation, and resilience]
Əlavə olunmuş sənəddən
Terms of reference (ToR) for the procurement of services below the EU threshold
Form 41-14-3-en 1
Short Video production: Videos on climate change impacts on agriculture, adaptation, and resilience
Project number/ cost centre:
21.9025.4-005.00
0. List of abbreviations ................................ ................................ ................................ ..... 2 1. Context ................................ ................................ ................................ ......................... 3 2. Tasks to be performed by the contractor. ................................ ................................ ..... 4 3. Concept ................................ ................................ ................................ ........................ 6
Technical-methodological concept ................................ ................................ ............... 6
Project management of the contractor (1.6) ................................ ................................ . 6 4. Personnel concept................................ ................................ ................................ ........ 7
Team leader ................................ ................................ ................................ ................. 7
Key expert 1 (Editor) ................................ ................................ ................................ .... 7
Expert 2 ................................ ................................ ......... Error! Bookmark not defined.
5. Costing requirements ................................ ................................ ................................ ... 9 6. Requirements on the format of the tender ................................ ................................ .... 9
2 0. List of abbreviations
PROGRESS Promoting Green Deal Readiness in the Eastern Partnership Countries
BMUV German Federal Ministry for the Environment, Nature Conservation, Nuclear
Safety and Consumer Protection
ToRs Terms of reference
GHG Greenhouse Gas
EaP Eastern Partnership
MoA Ministry of Agriculture of the Republic of Azerbaijan
KOBIA Small and Medium Business Development Agency of the Republic of
Azerbaijan
3 1. Context
The project „ Promoting Green Deal Readiness in the Eastern Partnership Countries ” (PROGRESS) is funded by the International Climate Initiative (IKI) of the German Federal
Government and is implemented by the Deutsche Gesellschaft für Internationale
Zusammenarbeit (GIZ) GmbH, as the lead agency, in partnership with the Organisation for
Economic Co-operation and Development (OECD), the Regional Environmental Centre for the
Caucasus (REC), the European Business Association (EBA) Moldova and the Institute for
Economics and Forecasting of the National Academy of Sciences of Ukraine (IEF). The duration of the project is 4,5 years (10/2023 – 04/2028), and the budget is 20 Mio EUR.
PROGRESS supports the countries of the Eastern Partnership (EaP) in their transition to climate-oriented, resilient, and green economic development . It aims to improve the conditions for the transformation of selected agricultural and related industrial food value chains. The project promotes the introduction of innovative technologies, tools and methodologies that provide a significant impetus for a transition to greater sustainability, climate resilience and long -term Greenhouse Gas (GHG) mitigation in th e region, accompanied by improved enabling framework conditions. Better access to financing options and support for the further improvement of existing financing mechanisms and instruments involving for example national banks, development banks and public budgets will facilitate implementation. Good practices and expertise will be fostered via regional exchange and anchored in the institutional structures of the regional and national implementing partners.
The project coordination unit is based in Georgia with project representation offices in each of the five partner countries. PROGRESS is implemented through a consortium consisting of GIZ, the Organisation for Economic Co -operation and Development (OECD), the Regional
Environmental Centre for the Caucasus (REC) in Azerbaijan, Armenia, and Georgia, the
European Business Association (EBA) based in Moldova and the Institute of Economics and
Forecasting of the National Academy of Sciences of Ukraine (IEF) based in Ukraine. GIZ will serve as the Partnership Coordinator for the overall project coordination of PROGRESS.
As from July 2024, PROGRESS will include a multi -donor action jointly co -funded by the
European Union and BMUV on Decarbonization and Climate Resilience in the EaP (“EU4ClimateResilience”). The multi-donor action will be implemented by GIZ and OECD. As part of this multi -donor action, GIZ will support the countries’ capacity to adequately measure and reduce national emissions and increase their capacity to adapt to the impact of climate change. Further, the multi -donor action will implement demonstration pr ojects in selected municipalities in the EaP that demonstrate the benefits of climate adaptation. The focus of these demonstration projects will be set on nature-based solutions. During implementation, the project will closely coordinate with the Covenant of Mayors (CoM).
The PROGRESS project proposal was developed in close cooperation with local project partners (in Azerbaijan - Ministry of Agriculture - MoA) and the commissioning parties through two separate in-country appraisal missions. PROGRESS implementation has started in October 2023.
4
Output II of the PROGRESS focuses on providing in selected agro-value chains (fruits, berries, nuts) measures for climate-oriented, resilient, and green economic development in agriculture and related indust ries. A capacity -building program will then be developed to improve these support structures, so that they can provide better services to farmers and businesses in implementing climate-oriented, resilient, or green economic measures.
Knowledge packages, including gender -sensitive, biodiversity, innovation, digitalization aspects, will be made available and disseminated and farmers and business will benefit from business case/demonstration projects and related peer -learning. Activity (A II.2.2) requires to elaborate knowledge packages (in national languages) with view to enhancing service offers of each public or private local support structure to scale the implementation of climate -oriented, resilient and green economic measures in agri culture or industry, incl. gender transformative, biodiversity, innovation, digitalisation aspects (e.g. development of guidelines, success stories for farmers and businesses) and information features of existing information tools.
2. Tasks to be performed by the contractor.
The contractor will be responsible to produce 6 (six) short videos (approximately 2 min each) that will be produced to increase awareness about the impact of climate change on agriculture and to promote climate-resilient agriculture, as well as to improve the management of climatebased natural hazards. The contractor/video making company will closely cooperate with the author of the scripts, who previously wrote scripts of the videos . All ideas in the videos are copyrighted and GIZ must be credited when th ey are used. Videos will be in Azerbaijani language, with subtitles in English, with background music. All the vidoes must be in 1080p or higher.
Scripts for all videos will be provided to the contractor by G IZ and will be about the following topics:
1. Climate change stressed agriculture. Purpose of the video is to provide content for the video and explain the effects of climate change on agriculture and release some knowledge how to combat these effects. Target groups for this video are agricultural managers, farmers, communities.
2. Climate change and agricultural policy. Purpose of the video is to provide content for the video that aims to reveal gaps in recent agricultural policies and supports policy makers to develop new climate-oriented agricultural policies. Target groups for this video are policy makers, community leaders and agricultural managers.
3. Developing climate -resilient value chains. The main purpose of this script is to process the main content of the video to be produced on climate resilient value chains.
4. Promotion of water-resilient agriculture and water-saving irrigation technologies. The main purpose of the video to be prepared for this video is to determine the content of the video that promotes the reduction of water wastage, the application of modern irrigation methods and the possession of modern technologies. The main target groups for this video are small farmers.
5. Promotion of sustainable use of land resources. The main purpose of this video is to support a video that will promote approaches to prevent human-caused phenomena such as desertification, soil erosion, overgrazing, and salinization. The main target groups are small farmers, community groups, municipalities and other local administrators.
5 6. Reduction of greenhouse gases in agricultural activities. This video defines the main content of the video that will support the implementation of climate mitigation practices in agricultural activities. Small, medium, and large farmers as well as agricultural managers are the main target groups.
The individual contractor/ or company is responsible for providing the following services:
• Familiarize with projects approach to understand the PROGRESS objectives and its stakeholders and partners.
• Meeting with the project staff, partner organizations, support structures and stakeholders
• Follow the general data protection regulation (GDPR) and make sure that all people seen in the video have given their informed and written consent.
• Preparation of the story board based on the developed script and proposed shooting places for two-minute videos and agreeing with GIZ team and representatives of the partner ministry on the story board. The storyboard should clearly describe how the scenes will be visualized.
• Visit to farmers and local managers to capture video and audio footage outside of Baku.
The contractor will be responsible for the field trips while GIZ will assist the contractor for the organization of meetings with local managers and farmers.
• Production and sharing of initial 2 draft videos of 2 minutes each to GIZ for feedback .
The edited drafts should not only include clear visuals, but also graphics where appropriate, clear voice overs in Azerbaijani language, interview audios and background music (with consideration of the copyright laws) as well as subtitles in English that should be placed in ideal positions so that they don´t obstruct the visuals
• Incorporate feedback to the drafts and produce and submit the final 2 videos. At least 2 rounds of review are to be expected
• Production and sharing of additional 4 videos with the same requirements as for the initial 2 videos. Submission of revised and finalized 4 additional videos to GIZ.At least 2 rounds of review are to be expected.
Certain tasks, as laid out in the table below, are to be achieved during the contract term:
Milestones/partial works Deadline/place/person responsible
Criteria for acceptance
Delivery of the storyboard September 5, 2024 Storyboards prepared and approved by GIZ
Delivery of first 2 videos plus 2 rounds of review
November 5, 2024,
Contractor/ team leader 2 videos prepared and approved by
GIZ
Delivery of 4 more videos plus 2 rounds of review
January 31, 2025,
Contractor/ team leader 4 videos prepared and approved by
GIZ, and all raw material handed over
Period of assignment: from September 1, 2024, until January 31, 2025.
6
Reporting
• The contractor manages its costs and expenditures, accounting processes and report to
GIZ.
• The contractor shall report to GIZ. All the activities and technical issues should be closely coordinated and agreed beforehand. GIZ will provide the contractor with all the available information and materials in relevant areas as well as with necessary background and technical information upon request. The Contractor will be responsible for planning assignment-related meetings, events, and the timely delivery of the agreed deliverables.
All the documents shall be delivered electronically in the Azerbaijani and English languages to GIZ, using the official reporting format, which will be provided by GIZ.
3. Concept
During the tender, t he tenderer is required to show how the objectives defined in Chapter 0 (Tasks to be performed) are to be achieved, if applicable under consideration of further methodrelated requirements (technical -methodological concept). In addition, the tenderer must describe the project management system for service provision.
Note: The numbers in parentheses correspond to the lines of the technical assessment grid.
Technical-methodological concept
Strategy (1.1): The tenderer is required to consider the tasks to be performed regarding the objectives of the services put out to tender (see Chapter 1 Context) (1.1.1). Following this, the tenderer presents and justifies the explicit strategy with which it intends to provide the services for which it is responsible (see Chapter 0 Tasks to be performed) (1.1.2).
The tenderer is required to present the actors relevant for the services for which it is responsible and describe the cooperation (1.2): presentation and interaction between the relevant actors (1.2.1) and strategy for establishing cooperation and then cooperating with the relevant actors (1.2.2).
The tenderer is required to describe the key processes (1.4) for the services for which it is responsible and create an operational plan or schedule (1.4.1) that describes how the services according to Chapter 0 (Tasks to be performed by the contractor) are to be provided. In particular, the tenderer is required to describe the necessary work steps and, if applicable, take account of the milestones and contributions of other actors (partner contributions) in accordance with Chapter 2 (Tasks to be performed) (1.4.2).
The tenderer is required to describe its contribution to knowledge management for the partner (1.5.1) and GIZ and to promote scaling-up effects (1.5.2) under learning and innovation (1.5).
Project management of the contractor (1.6)
The tenderer is required to draw up approach and procedure for coordination with/in GIZ project (1.6.1 with personnel assignment plan (1.6.2) and backstopping strategy (1.6.3) including CVs of technical and administrative back-stoppers; the plan includes information on assignment dates (duration and expert months) and locations of the individual members of the team complete with the allocation of work steps as set out in the schedule.
7 4. Personnel concept
The tenderer is required to provide personnel who are suited to filling the positions described, based on their CVs (see Chapter 6), the range of tasks involved and the required qualifications.
The below-specified qualifications represent the requirements to reach the maximum number of points in the technical assessment.
Team leader
Tasks of the team leader
• Overall responsibility for the advisory packages of the contractor (quality and deadlines)
• Coordinating and ensuring communication with GIZ, partners and others involved in the project
• Work closely with script writer
• Planning and steering the Tasks mentioned in Chapter 2 and working closely with the task crew
• Developing of main ideas and approaches for videos and identification of the forms
• Supervise filming process all the time
• Regular reporting in accordance with deadlines
Qualifications of the team leader
• Education/training (2.1.1): University/Tertiary qualification on journalism and media or related field
• Language (2.1.2): C1-level language proficiency in English
• General professional experience (2.1.3): 3 years of professional experience in multimedia content production.
• Specific professional experience (2.1.4): 3 years in producing video content for digital & social media platforms, consistent with current Audio Visual (AV) trends and styles for the digital and social media sector. Proven experience in creating videos.
• Leadership/management experience (2.1.5): 10 years of management/leadership experience as a project team leader or manager in a company
• Development cooperation (DC) experience (2.1.7): 3 years of experience in DC projects
Key expert 1 (Editor)
Tasks of key expert 1
• Editing to produce final cuts at minimum 1080p.
• Subtitling in English
• Animation and graphic editing
• Visual scripting/storyboarding
8
Qualifications of key expert 1
• Education/training (2.2.1): University/Tertiary qualification on journalism and media or related field
• Language (2.2.2): Good business English level, at B2 or higher
• General professional experience (2.2.3): 3 years of professional experience in multimedia content production.
• Specific professional experience (2.2.4): 3 years in editing video content for digital & social media platforms, including animated/infographic videos and documentary-style profile stories consistent with current Audio Visual (AV) trends and styles for the digital and social media sector
• Leadership/management experience (2.2.5): N/A
• Regional experience (2.2.6): N/A
• Development cooperation (DC) experience (2.2.7): 2 years of experience in DC projects
• Other (2.2.8): N/A
Short-term expert pool with minimum 1, maximum 3 members
For the technical assessment, an average of the qualifications of all specified members of the expert pool is calculated. Please send a CV for each pool member (see below Chapter 6
Requirements on the format of the bid) for the assessment.
Tasks of the short-term expert pool
• Carry out all aspects of production (e.g., scripting, filming, lights, sound, studio set-up, interviews).
Qualifications of the short-term expert pool
• Education/training (2.6.1): University/Tertiary qualification and 3 years of experience as cameraman and playing a technical role in a production crew.
• Language (2.6.2): Good business language skills in English at B2 or higher).
• General professional experience (2.6.3): 3 years of professional experience in multimedia content production and campaign design.
• Specific professional experience (2.6.4): 3 years in production/ filming video content for digital & social media platforms, and/or interviewing subjects, light/sound technical expertise.
• Leadership/management experience (2.6.5): N/A
• Regional experience (2.6.6): N/A
• Development cooperation (DC) experience (2.6.7): N/A
• Other (2.6.8): N/A
9
Soft skills of team members
In addition to their specialist qualifications, the following qualifications are required of team members:
• Team skills
• Initiative
• Creativity
• Communication skills
• Socio-cultural skills
• Efficient, partner- and client-focused working methods
• Interdisciplinary thinking 5. Costing requirements
Since the contract to be concluded is a contract for works, we would ask you to offer your services at a lump sum price.
In addition, the assessment of the financial bid is also based on the underlying daily rate. Please also provide the underlying daily rate. A breakdown of days is not required.
6. Requirements on the format of the tender
The structure of the tender must correspond to the structure of the ToRs. In particular, the detailed structure of the concept (Chapter 3) should be organised in accordance with the positively weighted criteria in the assessment grid (not with zero). The t ender must be legible (font size 11 or larger) and clearly formulated. It must be drawn up in English (language).
The complete tender must not exceed 10 pages (excluding CVs). If one of the maximum page lengths is exceeded, the content appearing after the cut -off point will not be included in the assessment. External content (e.g. links to websites) will also not be considered.
The CVs of the personnel proposed in accorda
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
303 elan
Winter Park Plaza 75, Rasul Rza street, office no.202, Baku
http://www.giz.de/giz-aserbaidschan@giz.de(99412) 599 91 20Bunlar təşkilatın öz əlaqə məlumatlarıdır. AZERWEB.AZ yalnız onun elanlarını dərc edir.
Şirkət profili