Tender
TENDER [ Demand analyses of water resources ECOserve ]
Əlavə olunmuş sənəddən
Subject of tender: Demand analysis of water resources for sustainable agriculture in Azerbaijan
Dear Tender Participant,
GIZ-Baku Office would like to announce a tender on demand analysis of water resources for sustainable agriculture in Azerbaijan.
Should you be interested in implementing the tasks according to the task description (Annex 1), we request you to submit us your bids in the following way:
Submitting of the technical offer and financial offers: Due to the COVID 19 we kindly ask you to submit separately! the technical and financial offers via email on following email address: AZ_Quotation@giz.de latest by 12th of
January 2021.
The email with technical offer must correspond to the structure of the ToRs.
It must be legible (font size 11 or larger) and clearly formulated. Pls.
consider the requirements in the Chapter 7 of TOR, Please mark the subject of the email as follow: “Technical offer/ “Demand analysis of water resources
ECOserve”.
The email with financial offer should include a fixed lump sum price that covers all applicable costs. The price bid will be evaluated based on the specified lump sum price. Please also provide the breakdown of the lump sum. Please mark the subject of the email as follow: “Financial offer /
“Demand analysis of water resources ECOserve”.
Please note that there should not be any financial information mentioned in the technical bid.
You can email your further questions (but no bids!!!!) latest by 8th of January to Sabina Hadjiyeva – sabina.hajiyeva@giz.de. Please, consider that for ensuring the equal circumstances for all parties the answers to your questions will be sent to all tender participants. The bids not complying with these rules will not be considered by us. Unfortunately, any questions submitted after 08.01.2021 will not be answered.
The bids received will be evaluated by the GIZ office Baku (see the Annex 2). Only financial bids of companies/individuals fulfilling the technical
GIZ Office Baku |Winter Park Plaza|75, Rasul Rza Street, Office Nr. 202 • AZ 1014, Baku • Azerbaijan
To all tender participants
From: GIZ Baku Office
Project number :2018.2062.0-003.00
Project name: Management of natural resources and safeguarding of ecosystem services for sustainable rural development in the
South Caucasus (ECOserve)
Country: Azerbaijan
German Development Cooperation
GIZ Office Baku
Winter Park Plaza 75, Rasul Rza Street, Office Nr. 202
AZ 1014, Baku, Aserbaijan
T 99412 5999120-25
F 99412 5999126 giz-aserbaidschan@giz.de
Your reference
Our reference
27 December 2020
Deutsche Gesellschaft für
Internationale Zusammenarbeit (GIZ) GmbH
Registered offices
Bonn and Eschborn, Germany
Friedrich-Ebert-Allee 32 + 36 53113 Bonn, Germany
T +49 228 44 60-0
F +49 228 44 60-17 66
Dag-Hammarskjöld-Weg 1 - 5 65760 Eschborn, Germany
T +49 61 96 79-0
F +49 61 96 79-11 15
E info@giz.de
I www.giz.de
Registered at
Local court (Amtsgericht)
Bonn, Germany
Registration no. HRB 18384
Local court (Amtsgericht)
Frankfurt am Main, Germany
Registration no. HRB 12394
Chairman of the Supervisory Board
Martin Jäger, State Secretary
Management Board
Tanja Gönner (Chair)
Ingrid-Gabriela Hoven
Thorsten Schäfer-Gümbel
Page 2/2,
requirements will be opened and evaluated by an authorized person. The evaluation rate is 70% for technical and 30% for the financial bid.
Based on the evaluation results a ranking list of candidates will be prepared.
Contractual negotiations are generally commenced with the first bidder on the list. Should these negotiations not be successful, the second bidder on the list shall be invited to commence negotiations.
If you do not receive an order in writing within two weeks of expiry of the deadline for the submission of offers, your bid has not been accepted. You shall not receive separate notice to this effect.
Annexes 1. Annex 1 ToR dataset National Consultant 2. Annex 2 TAG dataset National Consultant
Best regards,
Sabina Hajiyeva
Contracting and Procurement Officer
Terms of reference (ToRs) for the procurement of services below the EU threshold
Form 41-14-1-en 1
Demand analysis of water resources for sustainable agriculture in
Azerbaijan
Project number/ cost centre:
2018.2062.0-003.00
0. List of abbreviations ................................ ................................ ................................ .. 2 1. About ECOserve ................................ ................................ ................................ ......... 3 2. Context ................................ ................................ ................................ ........................ 4 3. Tasks to be performed by the contractor ................................ ................................ . 5 4. Concept ................................ ................................ ................................ ....................... 6
Technical-methodological concept ................................ ................................ ............... 6
The contractor should state his/her experience in this field in more details and indicate in which activities he/ she was already involved in similar projects. ..................... 7
Project management of the contractor ................................ ................................ .......... 7 5. Personnel concept ................................ ................................ ................................ ..... 8
Team leader ................................ ................................ ................................ ................. 8
Expert 1 ................................ ................................ ......... Error! Bookmark not defined.
6. Costing requirements ................................ ................................ ................................ 9
Assignment of personnel ................................ ................................ .............................. 9
Travel ................................ ................................ ................................ ..........................10 7. Requirements on the format of the bid ................................ ................................ ....10
2 0. List of abbreviations
AVB General Terms and Conditions of Contract (AVB) for supplying services and work 2018
ToRs Terms of reference
GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit
GIS Geographical Information System
ECOserve Management of natural resources and safeguarding of ecosystem services for sustainable rural development in the South Caucasus
MoA Ministry of Agriculture
MENR Ministry of Ecology and Natural Resources
TA Technical Assessment
IWRM Integrated Water Recourses Management
MRV Monitoring-Reporting-Verification (system)
3 1. About ECOserve
The programme “Management of natural resources and safeguarding of ecosystem services for sustainable rural development in the South Caucasus” (ECOserve) is part of the wider
German support in the priority area “Environmental policy, conservation and sustainable use of natural resources in the South Caucasus”, which aims at the sustainable use of natural resources, biodiversity conservation and climate protection, particularly for t he benefit of the rural population, and at increasing the share of renewable energies in the energy mix and enhancing energy efficiency.
The objective of ECOserve is to improve the pre -conditions for the sustainable and biodiversity-friendly use of natural resources in the prevailing land -use systems in the South
Caucasus, with a special focus on energy security for the rural population.
ECOserve primarily contributes to achieving the SDG 15 (Protect, restore and promote sustainable use of terrestrial ecosystems) of the UN Agenda 2030, but also to achieving SDG 7 (Ensure access to affordable, reliable, sustainable and modern energy for all), SDG 13 (Take urgent action to combat climate change and its impacts), SDG 1 (End poverty in all its forms everywhere), and SDG 4 (Ensure inclusive and equitable quality education and promote lifelong learning opportunities for all).
The programme addresses the core problem in each of the three countries of the South
Caucasus, that the predominant land use system (forests, pastureland, agriculture land) is threatened by serious, progressive degradation. Furthermore, it encompasses the topic of energy insecurity the rural population is facing with. Across various levels, the data, regulations, practices and skills required for the sustainable and biodiversity -friendly use of natural resources are lacking.
State and private groups of resource users in rural areas of the South Caucasus, especially farmers, shepherds, state forestry enterprises and rural households that use fue lwood or manure as a source of heating energy, are the main target groups of ECOserve.
Political partner in Azerbaijan is the Ministry of Agriculture (MoA).
The programme addresses the predominant land use systems in the three countries by integrating en vironmental protection and natural resource conservation into the respective national reform processes.
The key outputs of ECOserve are as follows:
1. The availability of data as a basis for decision -making for the sustainable, biodiversity - friendly management of natural resources is improved.
2. The legal framework for the sustainable use of natural resources and the safeguarding of ecosystem services is improved.
3. Adapted practices for sustainable, biodiversity -friendly natural resource management in rural areas of the South Caucasus are available.
4 4. Information and education for resource users, service providers and specialized government bodies on sustainable and biodiversity-friendly natural resource management is improved.
5. Exchange between professionals of the three countries on the sustainable and biodiversityfriendly use of natural resources is promoted.
2. Context
The country's natural and climatic conditions allow the cultivation of agricultural crops all year round and 52.4 percent of the land cover is suitable for agriculture. Most of the agricultural land is situated in arid climate zone and agricultural product ion is coping with harsh climate conditions such as high temperatures and low precipitations. It is almost impossible to conduct agricultural production without proper irrigation systems. Azerbaijan's water resources are very limited. Thus, 70% of surface water resources are formed outside, and 30% in the country 1.
The greatest amount of water comes from cross -border rivers and inland water bodies such as lakes but is decreasing during drought years.
The development of the agricultural sector in Azerbaij an is based almost entirely on irrigated agriculture, i.e. 85-90% of all cotton is grown under irrigation. According to the ”Strategic
Roadmap for the production and processing of agricultural products in the Republic of
Azerbaijan”2 which was approved by the decree of the President of the Republic of Azerbaijan dated December 6, 2016 the Ministry of Agriculture is focusing to foster the economic approach of higher yields and more area under agriculture. Ensuring the economic efficiency of agriculture stable high yields of crops can be achieved only while ensuring the sustainable use of all resources (e.g. soil, water, and others) , considering only an efficient conversion of land suitable for agriculture, the proper use of agro -technology such as machinery and irrigation system, and right operational management.
Also transparency and accountability of the agricultural sector is of upmost importance, shall be based on international experience and in accordance with paragraph 2.2 of the Decree of the President of the Republic of Azerbaijan dated April 16, 2014 No. 152 "On measures to improve governance and accelerate institutional reforms in the agricultural sector"3.
One of the main priorities of the Ministry of Agriculture is to maintain and strengthen the sustainability of efficient agriculture in the country and to apply modern approaches. The ministry's official strategy also raised the issue of water demand and warned that environmental problems would arise if not addressed in a timely manner.
1 Agro.gov.az 2https://mida.gov.az/documents/strateji_yol_xeritesi_kend_teserrufati_mehsullarinin_istehsalina_ve_e malina_dair.pdf https://monitoring.az/assets/upload/files/8047fecde10eaf0fd8cb45de716d8267.pdf 3 http://www.e-qanun.az/alpidata/framework/data/27/c_f_27543.htm
5
ECOserve and its political partner agreed on the development on a new dataset, namely
“Demand analysis of water resources for sustainable agriculture” aiming to determine and calculate the water demand for agricultural production decision making . A first research revealed that water demand in agriculture is not properly considered in Azerbaijan so far although it is of utmost importance for agricultural forecast and management. An international consultancy company is supporting ECOserve in the dev elopment of the aforementioned dataset. The strategy to develop a sound database depicting the demand of water for sustainable agriculture in Azerbaijan is divided into two different analysis, the estimation of crop evapotranspiration and the estimation of soil water availability.
The dataset to be developed shall be used to
- forecast future water demand for agriculture
- consider the water demand of common agricultural crops and plants
- review existing water availability scenarios
- a basis for decision-making for agricultural production
- assist in the selection of crops suitable for the water availability 3. Tasks to be performed by the contractor
The project is looking for a national consultant that is is working under the guidance and supervision of the international expertise and ECOserve on a short-term basis. The consultant would provide support in the compilation and analysis of GIS data for the various needs of the projects. The following steps are preliminary steps and should lead the consultant in the overall understanding of this assignment:
• Review and provide currently available water/irrigation related datasets at MoA, MENR,
Azerbaijan Amelioration and Water Farm Open Joint Stock Company, and others, identification of data gaps, and advisory on additional data requirements
• Support in data collection on the ground/ collection of ground truthing data (if necessary) in order to verify data or to fill data gaps, e.g. of already existing datasets
• Coordinating with the international consultants and governmental stakeholders/ field teams (where relevant) working on the ground/collecting and existing data for each of the activities
• Convey progress, comments, problems etc. to the international consultants/ECOserve team regarding the implementation of GIS-related activities
The contractor is responsible for providing the following services:
• Exchange with ECOserve and international consultants on the implementation plan
• Coordinate the development of the new dataset with a responsible person at the Ministry of Agriculture on behalf of the international consultancy/ GIZ
• with the assistance of international consultant (hired by GIZ), obtain information and data on Azerbaijan’s water systems, surface and ground water resources, water infrastructure, topography, land use, agriculture, climate and soil data;
6
• Collection, analysis and evaluation of type and quality of all available data for the planned database and GIS;
• Coordinate the data collection, the ground truthing field campaign (collection of field survey data (ground truthing data) required for training, testing and verification of the classification) and data processing together with an ECOserve advisor and the international consultant
• Finalizing data collection (.shp, .dwg, .kml,.img, gml and etc.), preparation of results, preparation of recommendations. Handover of developed geodatabase to the MoA and
ECOserve GIZ including collected data.
• Full documentation of the data, geodatabase and other data inventory
• Final report.
Certain milestones, as laid out in the table below, are to be achieved by certain dates during the contract term, and at particular locations:
Milestone Deadline/place
Preliminary Briefing with ECOserve 01.2021, Baku
Research and preparation of data collection 01.2021, Baku
Processing and handover of collected data and review outcomes.
03.2021, Baku
Final report 04.2021, Baku
The final dataset and the data infrastructure shall be provided in an appropriate manner in a handover process to GIZ.
Period of assignment: From 01.2021 until 04.2021.
4. Concept
In the bid, the bidder is required to show how the objectives defined in Chapter 3 are to be achieved, if applicable under consideration of further specific method-related requirements (technical-methodological concept). In addition, the bidder must describe the project management system for service provision.
Technical-methodological concept
Strategy: The contractor should provide a methodological proposal or strategy demonstrating his understanding on data collection, ground truthing, and how to fill data gaps for the given development of a dataset on “Demand analysis of water resources for sustainable agriculture in Azerbaijan”.
If necessary, the consultant can demonstrate the involvement of several stakeholders required for the cooperation and explain how this collaboration is been planned regarding the data collection and data-layer development.
The contractor is required to describe the key processes for the services for which it is responsible and create a schedule that describes how the services according to Chapter 3
7 are to be provided. In particular, the consultant is required to describe the necessary work steps and, if applicable, take account of the milestones and contributions of other actors in accordance with Chapter 3.
The contractor should state his/her experience in this field in more details and indicate in which activities he/ she was already involved in similar projects.
Project management of the contractor
The bidder is required to explain its approach for coordination with the GIZ project.
• The contractor is responsible for selecting, preparing and steering the experts (international and national, short and long term) assigned to perform the advisory tasks.
• The contractor makes available equipment and supplies (consumables) and assumes the associated operating and administrative costs.
• The contractor manages costs and expenditures, accounting processes and invoicing in line with the requirements of GIZ.
The contractor reports regularly to GIZ in accordance with the AVB of the Deutsche
Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH from 2018
In addition to the reports required by GIZ in accordance with AVB, the contractor submits the following information:
• According to the methodology and concept to develop a dataset on ‘Demand analysis of water resources for sustainable agriculture in Azerbaijan’ necessary information data on water resources etc. should be submitted in the form of an inception report.
• Contributions to reports to GIZ’s commissioning party
• Once a dataset is prepared, it should be included in the latest report and all data should be submitted in a separate format (provision of data and data infrastructure).
• All materials received under the project must be handed over to GIZ ECOserve or the
Ministry of Agriculture
The bidder is required to describe its backstopping concept. The following services are part of the standard backstopping package, which (like ancillary personnel costs) must be factored into the fee schedules of the staff listed in the bid in accordance with section 5.4 of the AVB:
• Service-delivery control
• Managing adaptations to changing conditions
• Ensuring the flow of information between GIZ and field staff
• Contractor’s responsibility for seconded personnel
• Process-oriented technical-conceptual steering of the consultancy inputs
• Securing the administrative conclusion of the project
• Ens
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
303 elan
Winter Park Plaza 75, Rasul Rza street, office no.202, Baku
http://www.giz.de/giz-aserbaidschan@giz.de(99412) 599 91 20Bunlar təşkilatın öz əlaqə məlumatlarıdır. AZERWEB.AZ yalnız onun elanlarını dərc edir.
Şirkət profili