The tender has closed (11/5/2019). Current tenders
Tender
TENDER [ Renovation Materials Guba Vocational Lyceum ]
From the attached document
To: All tender participants
From: GIZ Baku Office
Project number: 16.2179.6-003.00
Project name: Private Sector Development and TVET in South Caucasus (PSDTVET SC)
Country: Azerbaijan
Subject of tender: Purchase of renovation materials for Guba Vocational School
Dear Tender Participant,
GIZ-Baku Office would like to announce a tender on purchase of renovation materials for Guba Vocational School.
Should you be interested in delivering of good specified in the Annex 1, we request you to submit us your financial offer latest by 05th of November 2019, 14:00 p.m. The offers can be submitted for one lot, several lots or all lots (s. Annex 1). Please include to the financial offer the transportation costs as well. Delivery place of good is Guba
Vocational Lyceum, Camo Hajinsky str.11, Guba. We are expecting the delivery of good on 11th of November 2019.
Bids are to be submitted in the stamped / sealed envelope in letterform to the following address: GIZ Office Baku, 75 Rasul Rza, Winter Park Plaza, 2nd floor, office 202,
Baku, Azerbaijan. The envelope should be clearly marked as “Financial offer/“Renovation materials”
Pls. note that 100% of payment will be done immediately after delivery.
You can email your further questions to Sabina Hajiyeva – sabina.hajiyeva@giz.de.
Please, consider that for ensuring the equal circumstances for all parties the answers to your questions will be sent to all tender participants.
If you do not receive an order in writing within two weeks of expiry of the deadline for the submission of offers, your bid has not been accepted. You shall not receive separate notice to this effect.
Annexes 1. Annex 1 List of renovation Materials _Metal Workshop Guba Vocational
School 2. Plaster_work 3. Primier, Plaster and painting 4. Lighting 5. Fasad_plan 6. Electricity
Regards,
Sabina Hajiyeva
Contracting and Procurement officer
German Development Cooperation
GIZ Office Baku
Winter Park Plaza 75, Rasul Rza Street, office no. 202
AZ 1014 Baku, Azerbaijan
T +994 599 91 20-25
F +994 599 91 26
Your reference
Our reference
30.10.2019
Office Baku
Deutsche Gesellschaft für
Internationale Zusammenarbeit (GIZ) GmbH
Registered offices
Bonn and Eschborn, Germany
Friedrich-Ebert-Allee 36 + 40 53113 Bonn, Germany
T +49 228 44 60-0
F +49 228 44 60-17 66
Dag-Hammarskjöld-Weg 1 - 5 65760 Eschborn, Germany
T +49 61 96 79-0
F +49 61 96 79-11 15
E info@giz.de
I www.giz.de
Registered at
Local court (Amtsgericht)
Bonn, Germany
Registration no. HRB 18384
Local court (Amtsgericht)
Frankfurt am Main, Germany
Registration no. HRB 12394
Chairman of the Supervisory Board
Dr Friedrich Kitschelt, State Secretary
Management Board
Tanja Gönner (Chair)
Dr Christoph Beier (Vice-Chair)
Thorsten Schäfer-Gümbel
№
İ ş i n
Name of measure
Unit of measurem ent
Short description Quantity Unit price Total Type of measure Comment
LOT 1 T əItems 0.0 1.1 4 0 s
Masonry openings for windows 40 cm thickness (material) m² 8 pc window by 1.8 m² 14.4 0.0 Materials
K uBlock pc 360
S eCement kg 144
Q uSand m³ 0.8 1.2 4 0 Masonry openings for doors 40 cm thickness (material) m² 2 pc door by 2.2 m² 4.4 0.0 Materials
K uBlock pc 110
S eCement kg 44
Q uSand m³ 0.2 1.3
D i v a r
Wall plastering (material) m²
Internal L=26.7 p.m. 4.9 H 62 p.m. 2.9 H+12*2.9 H
WC L=15 H=3 708.43 0.0 Materials
S eCement kg External L=45.6 H=6 3068
Q uSand m³ 8.5 1.40 F aWall isolation (material) m² External L=45.6 H=6 m 273.6 0.0 Materials
S e
Perlite and cement-based façade plaster (machine and hand applied) Bag 60.0 1.50
D i v
Primer work (material) m² Internal L=26.7 p.m. 3.7 H 62 p.m. 2.9 H 119 0.0 Materials
A sPrimer plaster Bag 20
Ü zwhite plaster Bag 5.0 1.60
D i v a
Wall painting(material) m² Internal L=26.7 p.m. 3.7 H 62 p.m. 2.9 H 278.59 0.0 Materials 1.70 0
.
5 s m
Concrete slab thickness of 0.5 cm (material) m²
Sector A (W=3.6 m
L=11.8); Sector B (W=4.5 m L=11.8); Sector C (W=6.5 m L=7.1) 141.73 0.0 Materials
B eConcrete m³ 14
A rRebar ton 2.2 1.80
P ə n c ə
Upgrading windows m²
Sector A 1 pc (W=1.4 m
H=1.6); Sector B 4 pc (W=1.4 m H=1.6); Sector C 3 pc (W=1.6 m H=2.8).
24.64 0.0 Materials 1.90 Q aUpgrading doors m² 7 pc door by 2 m² 14 0.0 Materials 1.10
D ö ş ə m
Upgrading floors m²
Sector A (W=3.6 m
L=11.8); Sector B (W=4.5 m L=11.8); Sector C (W=6.5 m L=7.1) 141.73 0.0 Materials
L aLaminat m² 155.0 1.11 K aTile cover installing (material) m² L=16 p.m.; h=2.9 46.4 0.0 Materials 1.12
T a v a n ı
Updating an Old Ceiling m²
Sector A (W=3.6 m
L=11.8); Sector B (W=4.5 m L=11.8); Sector C (W=6.5 m L=7.1) 141.73 0.0 Materials
Q uBox profile meter 264
L aPlastic Ceiling Panel m² 160.0
LOT 2 E lElectricity supply 0.0 2.10 0
.0.4 sq circuit breaker (250 A) pieces 1 Materials
Materials required for renovation of Metal Workshop at Guba Vocational Lyceum
2.20 3 f3-phase comb pieces 1 Materials 2.30 1 0Automatic 100 A 3 phase pieces 5 Materials 2.40 1 0 Automatic 10 A 3 phase pieces 5 Materials 2.50 1 x5 x4 power supply cable meter 1500 Materials 2.60 3 xMust be updated power supply cable 5x6 meter 750 Materials 2.70 2
.3 x2.5 power supply cable meter 700 Materials 2.80 1 6 5 x16 power supply cable meter 15 Materials 2.90 1 6 16 x 1 gofra hose meter 1500 Materials 2.10 1 2 Automatic circuit breakers 16 A 1 phase pieces 20 Materials 2.11 E lElecticity socket pieces 25 Materials 2.12 E lFloor box pieces 10 Materials 2.13 T oGround (electricity) set 1 Materials 2.14 E lElectricity switch pieces 10 Materials 2.15 K oElectricity box (large) pieces 4 Materials 2.16 K oElectricity box (little) pieces 5 Materials 2.17 S oElectrical Finishing pieces 30 Materials 2.18 L aMust be updated Led lighting 2 kv pieces 26 Materials 2.19 L aMust be updated Led lighting 0.5 kv pieces 14 Materials
LOT 3 S aPlumbing work 0.0 3.1 S aUpgrading Sanitary system set 1 Materials
Pipe PPR ( Ø 25) meter 151.0
Pipe PPR ( Ø 32) meter 85.0
Radiators 1.6 meter pieces 8.0
Bathroom radiator pieces 1.0
Sewer pipe Ø 110 meter 25.0
Sanitary fitting accessories set 1.0 3.2 S aNew Sanitary equipment set 1 Materials
Sanitary ware set 1.0 3.4 İ sHVAC equpiment set 1 Materials
Air Conditioner 15 000 BTU pieces 1.0
Air Conditioner 12 000 BTU pieces 2.0 4.0 T əMaterials Total 5.0
Mammadov R.ASMammadov A.ArchitectC.İ.P.Lists1E.Л.ListDoc.N°StageDateListSignitureSh/SayRevGuba Vocational LyceumSchool BuildingElectricityEmployer "GIZ"
GYMCorridorA
A
B
B
C
C
D
D 12341234
Floor box
Mammadov R.ASMammadov A.ArchitectC.İ.P. Lists1E.Л.ListDoc.N°StageDateListSignitureSh/SayRevGuba Vocational LyceumSchool BuildingEmployer "GIZ"
Mammadov R.ASMammadov A.ArchitectC.İ.P. Lists1E.Л.ListDoc.N°StageDateListSignitureSh/SayRevGuba Vocational LyceumSchool BuildingFasad PlanEmployer "GIZ" 3.601.601.605.002.301.2030.407.0311.992.80The Sewer line is 10 meters awayfrom the buildingThe Water line is 10 meters awayfrom the buildingThe Electric line is 10 meters awayfrom the buildingThe boiler room is located 60 metersaway from the building
Mammadov R.ASMammadov A.ArchitectC.İ.P.Lists1E.Л.ListDoc.N°StageDateListSignitureSh/SayRevGuba Vocational LyceumSchool BuildingElectricityEmployer "GIZ"
GYMCorridorA
A
B
B
C
C
D
D 12341234
Floor boxLed light 0.5 kvLed light 2 kv
Mammadov R.ASMammadov A.ArchitectC.İ.P.Lists1E.Л.ListDoc.N°StageDateListSignitureSh/SayRevGuba Vocational LyceumSchool BuildingPlaster workEmployer "GIZ"
GYMCorridorA
A
B
B
C
C
D
D 12341234 ABC
Mammadov R.ASMammadov A.ArchitectC.İ.P.Lists1E.Л.ListDoc.N°StageDateListSignitureSh/SayRevGuba Vocational LyceumSchool BuildingPrimer, painting and ceramicEmployer "GIZ"
GYMCorridorA
A
B
B
C
C
D
D 12341234
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
303 announcements
Winter Park Plaza 75, Rasul Rza street, office no.202, Baku
http://www.giz.de/giz-aserbaidschan@giz.de(99412) 599 91 20These are the organisation's own contacts. AZERWEB.AZ only publishes its announcements.
View Company Profile