Tender bitib (3/28/2019). Aktual tenderlər
Əlavə olunmuş sənəddən
German Development Cooperation
GIZ Office Baku
Winter Park Plaza 75, Rasul Rza Street, office no. 202
AZ 1014 Baku, Azerbaijan
T +994 599 91 20-25
F +994 599 91 26
Your reference
Our reference
11.03.2019
Office Baku
Deutsche Gesellschaft für
Internationale Zusammenarbeit (GIZ) GmbH
Registered offices
Bonn and Eschborn, Germany
Friedrich-Ebert-Allee 36 + 40 53113 Bonn, Germany
T +49 228 44 60-0
F +49 228 44 60-17 66
Dag-Hammarskjöld-Weg 1 - 5 65760 Eschborn, Germany
T +49 61 96 79-0
F +49 61 96 79-11 15
E info@giz.de
I www.giz.de
Registered at
Local court (Amtsgericht)
Bonn, Germany
Registration no. HRB 18384
Local court (Amtsgericht)
Frankfurt am Main, Germany
Registration no. HRB 12394
Chairman of the Supervisory Board
Dr Friedrich Kitschelt, State Secretary
Management Board
Tanja Gönner (Chair)
Dr Christoph Beier (Vice-Chair)
Dr Hans-Joachim Preuß
Cornelia Richter
To: All tender participants
From: GIZ Baku Office
Project number: 15.2101.2-003.00
Project name: Integrated Biodiversity Management, South Caucasus (IBiS)
Country: Azerbaijan
Subject of tender: Development of a handbook on integrated land use management of municipality land in mountain communities of Azerbaijan
Dear Tender Participant,
GIZ-Baku Office would like to announce a tender on development of a handbook on integrated land use management of municipality land in mountain communities of Azerbaijan.
Should you be interested in implementing the tasks according to the task description (Annex 1), we request you to submit us your bids latest by 28 of March 2019, 14:00 p.m.
Bids are to be submitted using the two-envelope procedure; i.e. bids must be submitted in two separate stamped / sealed envelopes in letterform to the following address: GIZ Office Baku, 75 Rasul Rza Street, Winter Park Plaza, 2nd floor, office 202, AZ 1014 Baku, Azerbaijan.
The first envelope should include the technical bid, which has to include the company profile or /the latest CV of the experts, concept, contact details of reference persons/companies for previous similar projects and an implementation plan of the work.
The second envelope should include the financial bid.
Each envelope should be clearly marked (“financial offer/ IMBES”, “technical offer/ IMBES”).
You can email your further questions latest by 18th of March, 16:00 p.m. to Sabina Hajiyeva – sabina.hajiyeva@giz.de . Please, consider that for ensuring the equal circumstances for all parties the answers to your questions will be sent to all tender participants. The bids not complying with these rules will not be considered by us. Unfortunately, any questions submitted after 18.03.2019 will not be answered.
The bids received shall be evaluated by the GIZ Office Baku with regard to their technical content and to their price (Assessment Grid for the Technical Evaluation of Bids, Annex 2). The evaluation rate is 70% for technical and 30% for the financial bid.
Based on the evaluation results a ranking list of candidates will be prepared. Contractual negotiations are generally commenced with the first bidder on the list. Should these negotiations not be successful, the second bidder on the list shall be invited to commence negotiations.
If you do not receive an order in writing within two weeks of expiry of the deadline for submission of offers, your bid has not been accepted. You shall not receive separate notice to this effect.
Annexes
Annex 1 ToR IMBES 20190301
Annex 2 Assessment_grid_IMBES Concept_20190304
Best regards,
Sabina Hajiyeva |
Contracting and Procurement Officer |
Brief programme information
The biodiversity of the South Caucasus is of global importance, but the huge variety of species and the proper functioning of the ecosystems are under threat. There is considerable pressure from the exploitation of natural resources by the local population, private industry and governments.
In each of the three countries of the South Caucasus – Georgia, Armenia and Azerbaijan – there are National Biodiversity Strategy and Action Plans (NBSAPs) and initial sectoral strategies for managing biodiversity and ecosystem services. As yet, however, these are unable to withstand the challenges posed by the conflicting interests of different sectors (forestry, pasture farming, agriculture, nature conservation and tourism). There is a lack of coordination between the various state and non-state actors and population groups (e.g. shepherds and farmers). In addition, there is not enough reliable data available on the different sectors to support planning and decision-making processes.
Within the framework of the Caucasus Initiative of the German government, the programme cooperates primarily with the environment ministries of the three different countries of the South Caucasus. The programme follows a multi-level approach. At national level, it promotes the development or revision of biodiversity strategies and regulations, particularly in forest and pasture management, and in erosion control. The experience gained from the pilot measures at district, municipal and local levels are incorporated into this process. As part of these pilot measures, relevant actors are provided with the skills needed to implement integrated approaches for sustainable management of biodiversity and ecosystem services.
The module objective of the programme is to promote better coordination of biodiversity and ecosystem services management across sectors on the basis of solid data. The programme comprises four areas of intervention with the following objectives:
Instruments and coordination processes for the sustainable management of biodiversity and ecosystem services at local level are tested.
The implementation capacity of line ministries, their subordinate bodies and of training institutions regarding the management of biodiversity and ecosystem services is improved.
The perception of the general public towards the importance of biodiversity and ecosystem services is more positive.
The regional exchange on sustainable management of biodiversity and ecosystem services is improved.
IBiS follows up on the achievements of the programmes “Sustainable Management of Biodiversity, South Caucasus” (=SMBP) and “Integrated Erosion Control in Mountainous Regions, South Caucasus” = (IEC), and is due to last four years (from December 2015 to November 2019). It was agreed that all identified erosion control measures will be implemented under the IBiS programme.
The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Federal Ministry of Economic Cooperation and Development (BMZ) with co-funding in Armenia and Georgia from the Austrian Development Cooperation (ADC).
Context
Previous assessment studies depict severe problems on land management (conflict on land use, erosion, overgrazing, etc.) for selected areas of mountain regions of Azerbaijan. The studies conclude that the focus on animal husbandry as main economic income of local communities leads to overgrazing and degradation of pastures. The degraded pastures threaten the livelihoods of local rural communities, as their economic stability is at risk (beekeeping, wild collection, animal husbandry) and their resilience towards natural hazards is diminishing. Eventually, degraded land leads to conflicts between different land users within and between the communities. In order to ensure sustainable economic development, it is therefore important that communities manage their lands on a long term perspective in an integrated and sustainable manner.
Integrated land use management is an essential prerequisite for sustainable development and it aims to balance the economic, social and environmental value of land, yet with the focus to safeguard natural resources for long term use. Furthermore, it fosters synergies among different land use approaches.
During the last three years pilot interventions on integrated land use management have been implemented by IBiS in close cooperation with local decision makers and communities in Ismayilli, which is one of 66 districts of Azerbaijan. Based on the results of a feasibility study, suitable measures were identified, and implemented on common pasture land of a pilot village (Ehen). The pilot interventions of the programme proposed land use and conflict management, improvement and maintenance of ecosystems services, income generation of rural communities and practical erosion control measures. All measures have been evaluated and cost benefit analysis (CBA) were implemented, stating a positive impact on the management of natural resources and a positive benefit over cost ratio for different interventions. The issues on land management in the pilot village are mostly similar to other municipalities in the mountain region of Azerbaijan. Therefore, the valuable experiences gained from the pilot interventions shall be translated in to a handbook accessible for other rural municipalities.
Objectives and tasks
The objective of the assignment is to develop a handbook on the integrated land use management of municipality land in mountain communities of Azerbaijan. The target group of the handbook are decision-makers and practitioners of municipalities and rural communities and other relevant organisations (district administration, ministries). The handbook shall describe all implemented pilot measures by GIZ-IBiS, explain the value of well managed ecosystem services and their socio-economic impact. The existing results of monitoring, cost-benefit analysis, evaluation outcomes, participatory aspects during pilot project implementation, land use planning and ideas on alternative measures shall be integrated into the handbook. It is of utter importance that the handbook is combining and condensing the available information into a praxis relevant and easy to understand/follow document. The focus shall be the user-friendliness of the manual for the mentioned target group.
The consultant shall accomplish the following tasks:
Develop a concept of the handbook structure (including table of content) that reflects the needs of the target group and discuss it with IBiS
Describe the overall situation on land use management of mountain communities in Azerbaijan:
Describe current land use management and occurring environmental and social issues
Summarize types of land ownership and challenges in management of municipality land
Assess and describe the interests and needs of different stakeholders and land users
Analyze and condense the results of IBiS pilot project activities (CBA results, evaluation outcomes, etc.) into a praxis relevant format: community-based approach, erosion control measures, alternative income generation, conflict resolution, etc.
Based on the analysis of implemented pilot measures develop recommendations for the target group regarding a relevant integrated land use management
Present outcomes of the research on integrated land use management during a workshop (April-May) for stakeholders in Ismayilli and discuss recommendations
Combine all findings into the final handbook.
Expected outputs
Expected outputs are:
Research and interviews with relevant stakeholders and GIZ-IBiS on the land management situation in mountain villages of Azerbaijan and collection of relevant IBiS pilot intervention documents
Concept on how to structure the handbook in a relevant way for the target group
Preparation, conduction and documentation of a workshop with different stakeholders in Ismayilli on integrated land use management
Final handbook on integrated land use management of municipality land in mountain communities of Azerbaijan (English/Azerbaijani).
Format for reports and documentations will be provided by GIZ-IBiS. All documents and reports shall be delivered electronically (text files) in English language to GIZ-IBiS. The handbook needs to be available in English and Azerbaijani.
Time frame and work schedule
The assignment covers up to 22 working days within the contract period.
The consultant will coordinate closely in all technical matters with Samir Abbasov (advisor in GIZ-IBiS AZ). The field coordinators of GIZ-IBiS project will assist the consultant during all field visits. The consultant will coordinate closely in all contractual issues with Dr. Patric Schlager, team leader of GIZ-IBiS in Azerbaijan.
Programme: | Integrated Biodiversity Management, South Caucasus (IBiS)
PN: | 15.2101.2-003.00
Assignment: | Development of a handbook on integrated land use management of municipality land in mountain communities of Azerbaijan
Period: | 01.04.2019 – 31.07.2019
Fee days | Number of days up to | Comments | Date
Preparation/debriefing with IBiS | 1 | | 01.04.2019
Analysis of the situation of mountain villages in Azerbaijan, including field visit | 4 | 2 days Ismayilli | 08.04.2019
Research on types of land ownership and challenges | 2 | | 15.04.2019
Analyze and condense results of IBiS pilot project activities | 4 | | 22.04.2019
Develop integrated land use management concept | 2 | | 29.04.2019
Prepare and conduct workshop in Ismayilli | 2 | | 15.05.2019
Developing recommendations for land use management | 1 | | 03.06.2019
Prepare final handbook | 4 | | 14.06.2019
Travel days | 2 | 2 x Baku - Ismayilli |
Travel expenses | Number of days/nights up to | Comments |
Per diem | 4 | |
Accommodation allowance | | |
Other travel expenses | | Comments |
Number of domestic trips | 2 | |
Number of trips abroad | | |
Ancillary travel expenses (e.g. visa, airport transfers) | | |
Flights | Number of flights up to | Comments |
International flights | | |
Domestic flights | | |
Other costs | | Comments |
| | |
| | |
| | |
Date
PN
VN (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting points assessment points assessment points assessment points assessment points assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) 1.
1.1 15 1.2 15 1.3 1.4 10 1.5 40 2.
2.1 2.2 0 3.
0 4.
4.1 4.1.1 10 15 4.1.2
Working with rural population, local governance structures 10 4.1.3 10 4.1.4 15 60
Language skills
Specific qualification
- special field
- management experience
- ability to work in a team
Subtotal 4.1
Regional experience / Knowledge of country
International experience, consulting in development context
Azeri/English
Version (1)
Criteria
Consideration of local resources
Technical Assessment Grid of Offers
Section 3800
Overall assessment
Samir Abbasov, Patric Schlager
Hans-Joachim LippAV
Company 2 Company 3 Company 4 Company 5
Integrated Biodiversity Management, South Caucasus (IBiS)
Company 1 15.2101.2-003.00
VN
Project Short Title 04.03.2019
Assessor
Qualification of proposed staff
Appr. 5 years experience with environmental publications
General qualification
MSc: Natural Ressources Management or equivalent education
Expert 1: Environmental management
Appropriateness of suggested concept and work plan
Total 2.
Implementation methods: Management
Staff and backstopping conception (as part of the steering structure))
Technical backstopping / Knowledge Management
Interpretation of objectives
Strategy (technical concept/alternative concepts)
Total 1.
Monitoring and evaluation concept (as part of L+I)
Work schedule and time schedule of processes, Cooperation, Steering structure,
Learning and Innovation
Knowledge and information management (as part of L+I)
Form 31-2-14-en page 1 of 4
Date
PN
VN (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting points assessment points assessment points assessment points assessment points assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3)
Version (1)
Criteria
Technical Assessment Grid of Offers
Section 3800
Overall assessment
Samir Abbasov, Patric Schlager
Hans-Joachim LippAV
Company 2 Company 3 Company 4 Company 5
Integrated Biodiversity Management, South Caucasus (IBiS)
Company 1 15.2101.2-003.00
VN
Project Short Title 04.03.2019
Assessor 4.2 4.2.1 4.2.2 4.2.3 4.2.4 0 4.3 4.3.1 4.3.2 4.3.3 4.3.4 0
Subtotal 4.2
Expert 2:
General qualification
Specific qualification
- special field
- management experience
- ability to work in a team
Regional experience / Knowledge of country
Language skills
Expert 3:
General qualification
- B30
- professional experience
Specific qualification
- special field state field
- management experience
- ability to work in a team
Regional experience / Knowledge of country state country / region
Language skills state language
Subtotal 4.3
Form 31-2-14-en page 2 of 4
Date
PN
VN (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting points assessment points assessment points assessment points assessment points assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3)
Version (1)
Criteria
Technical Assessment Grid of Offers
Section 3800
Overall assessment
Samir Abbasov, Patric Schlager
Hans-Joachim LippAV
Company 2 Company 3 Company 4 Company 5
Integrated Biodiversity Management, South Caucasus (IBiS)
Company 1 15.2101.2-003.00
VN
Project Short Title 04.03.2019
Assessor 4.4 4.4.1 4.4.2 4.4.3 4.4.4 0 4.5 4.5.1 4.5.2 4.5.3 4.5.4 0
Language skills
Subtotal 4.5 state language
- management experience
- ability to work in a team
Regional experience / Knowledge of country state country / region
Specific qualification
- special field state field
General qualification
- training
- professional experience
Pool of experts 1:
state language
Expert 4:
General qualification
Language skills
- training
- professional experience
Specific qualification
- special field state field
- management experience
- ability to work in a team
Regional experience / Knowledge of country state country / region
Subtotal 4.4
Form 31-2-14-en page 3 of 4
Date
PN
VN (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting points assessment points assessment points assessment points assessment points assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3)
Version (1)
Criteria
Technical Assessment Grid of Offers
Section 3800
Overall assessment
Samir Abbasov, Patric Schlager
Hans-Joachim LippAV
Company 2 Company 3 Company 4 Company 5
Integrated Biodiversity Management, South Caucasus (IBiS)
Company 1 15.2101.2-003.00
VN
Project Short Title 04.03.2019
Assessor 4.6 4.6.1 4.6.2 4.6.3 4.6.4 0 4.7 60 100
Assessment in % 0 0 0 0 0 5.
- special field state field
- management experience
- ability to work in a team
Regional experience / Knowledge of country state country / region
Specific qualification
Pool of experts 2:
General qualification
I hereby declare that I conducted this evaluation independently and to the best of my knowledge and belief. I will treat the information confidentially and not pass on any particulars of the on-going evaluation procedure.
Date, signature place
Special advantages / risks (see extra page) place
Language skills state language
Subtotal 4.6
Composition of the team
Grand Total 1. – 4.
Total 4.
- training
- professional experience
Gewichtungen müssen insgesamt 100 ergeben.
Form 31-2-14-en page 4 of 4
Əlavələr
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
303 elan
Winter Park Plaza 75, Rasul Rza street, office no.202, Baku
http://www.giz.de/giz-aserbaidschan@giz.de(99412) 599 91 20Bunlar təşkilatın öz əlaqə məlumatlarıdır. AZERWEB.AZ yalnız onun elanlarını dərc edir.
Şirkət profili