From the attached document
German Development Cooperation
GIZ Office Baku
Winter Park Plaza 75, Rasul Rza Street, office no. 202
AZ 1014 Baku, Azerbaijan
T +994 599 91 20-25
F +994 599 91 26
Your reference
Our reference
15.03.2018
Office Baku
Deutsche Gesellschaft für
Internationale Zusammenarbeit (GIZ) GmbH
Registered offices
Bonn and Eschborn, Germany
Friedrich-Ebert-Allee 36 + 40 53113 Bonn, Germany
T +49 228 44 60-0
F +49 228 44 60-17 66
Dag-Hammarskjöld-Weg 1 - 5 65760 Eschborn, Germany
T +49 61 96 79-0
F +49 61 96 79-11 15
E info@giz.de
I www.giz.de
Registered at
Local court (Amtsgericht)
Bonn, Germany
Registration no. HRB 18384
Local court (Amtsgericht)
Frankfurt am Main, Germany
Registration no. HRB 12394
Chairman of the Supervisory Board
Dr Friedrich Kitschelt, State Secretary
Management Board
Tanja Gönner (Chair)
Dr Christoph Beier (Vice-Chair)
Dr Hans-Joachim Preuß
Cornelia Richter
To: All tender participants
From: GIZ Baku Office
Project number: 15.2101.2-003.00
Project name: Integrated Biodiversity Management, South Caucasus (IBiS)
Country: Azerbaijan
Subject of tender: Development of design of a drip irrigation system for hazelnut plantation in Ismayilli
Dear Tender Participant,
GIZ-Baku Office would like to announce a tender on development of design of a drip irrigation system for hazelnut plantation in Ismayilli.
Should you be interested in implementing the tasks according to the task description (Annex 1), we request you to submit us your bids latest by 28th of March 2018, 14:00 p.m.
Bids are to be submitted using the two-envelope procedure; i.e. bids must be submitted in two separate stamped / sealed envelopes in letterform to the following address: GIZ Office Baku, 75 Rasul Rza Street, Winter Parkl Business Center, AZ 1014 Baku, Azerbaijan. The first envelope should include the technical bid, which has to include the company profile or latest CV of the expert, contact details of reference persons/companies for previous similar projects and an implementation plan of the work. The second envelope should include the financial bid. Each envelope should be clearly marked (“financial offer/subject of tender”, “technical offer/subject of tender”).
Please note that there should not be any financial information mentioned in the technical bid.
You can email your further questions latest by 19th of March, 16:00 p.m. to Sabina Hajiyeva – sabina.hajiyeva@giz.de . Please, consider that for ensuring the equal circumstances for all parties the answers to your questions will be sent to all tender participants. The bids not complying with these rules will not be considered by us. Unfortunately, any questions submitted after 19.03.2018 will not be answered.
The bids received shall be evaluated by the GIZ Office Baku with regard to their technical content and to their price (Assessment Grid for the Technical Evaluation of Bids, Annex 2). The evaluation rate is 70% for technical and 30% for the financial bid.
Based on the evaluation results a ranking list of candidates will be prepared. Contractual negotiations are generally commenced with the first bidder on the list. Should these negotiations not be successful, the second bidder on the list shall be invited to commence negotiations.
If you do not receive an order in writing within two weeks of expiry of the deadline for submission of offers, your bid has not been accepted. You shall not receive separate notice to this effect.
Annexes
Annex 1: TOR_drip irrigation system expert
Annex 2: Assessment grid_irrigation system
Best regards,
Sabina Hajiyeva |
Contracting and Procurement Officer |
Brief programme information
The biodiversity of the South Caucasus is of global importance, but the huge variety of species and the proper functioning of the ecosystems are under threat. There is considerable pressure from the exploitation of natural resources by the local population, private industry and governments.
In each of the three countries of the South Caucasus – Georgia, Armenia and Azerbaijan – there are National Biodiversity Strategy and Action Plans (NBSAPs) and initial sectoral strategies for managing biodiversity and ecosystem services. As yet, however, these are unable to withstand the challenges posed by the conflicting interests of different sectors (forestry, pasture farming, agriculture, nature conservation and tourism). There is a lack of coordination between the various state and non-state actors and population groups (e.g. shepherds and farmers). In addition, there is not enough reliable data available on the different sectors to support planning and decision-making processes.
Within the framework of the Caucasus Initiative of the German government, the programme cooperates primarily with the environment ministries of the three different countries of the South Caucasus. The programme follows a multi-level approach. At national level, it promotes the development or revision of biodiversity strategies and regulations, particularly in forest and pasture management, and in erosion control. The experience gained from the pilot measures at district, municipal and local levels are incorporated into this process. As part of these pilot measures, relevant actors are provided with the skills needed to implement integrated approaches for sustainable management of biodiversity and ecosystem services.
The module objective of the programme is to promote better coordination of biodiversity and ecosystem services management across sectors on the basis of solid data. The programme comprises four areas of intervention with the following objectives:
Instruments and coordination processes for the sustainable management of biodiversity and ecosystem services at local level are tested.
The implementation capacity of line ministries, their subordinate bodies and of training institutions regarding the management of biodiversity and ecosystem services is improved.
The perception of the general public towards the importance of biodiversity and ecosystem services is more positive.
The regional exchange on sustainable management of biodiversity and ecosystem services is improved.
IBiS follows up on the achievements of the programmes “Sustainable Management of Biodiversity, South Caucasus” (=SMBP) and “Integrated Erosion Control in Mountainous Regions, South Caucasus” = (IEC), and is due to last four years (from December 2015 to November 2019). It was agreed that all identified erosion control measures will be implemented under the IBiS programme.
The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Federal Ministry of Economic Cooperation and Development (BMZ) with co-funding in Armenia and Georgia from the Austrian Development Cooperation (ADC).
Context
In Azerbaijan, pilot activities are implemented in the district of Ismayilli, in close cooperation with local decision makers and communities. IBiS implements erosion control measures (ECM) in Ismayilli and up to now a number of ECM measures have been implemented. The local population who uses natural resources of communally managed land is the main target group. Special consideration is given to livestock farmers and shepherds, poor smallholder farms and women. A basic principle of the project is the combination of a village based approach with ecosystem-based adaptation.
The implementation of afforestation and bioengineering measures aims at demonstrating different options for reducing anthropogenic-induced erosion processes and to rehabilitate eroded areas. During the collaboration with the local municipality on different erosion control measures in 2016 and 2017, the wish of testing the planting of hazelnut trees on eroded areas to combat further erosion processes was expressed.
Within the GIZ-IBIS Program, a focus is set on using hazelnut plantations to stop erosive processes and soil loss. The hazelnut shrubs can stabilize the soil by its root system and above ground biomass will reduce the impact of heavy rain by slowing down the speed and energy of raindrops. The leaves of hazelnuts are fast decaying. By establishing hazelnut orchards on eroded sites which are exposed to high erosion risk (steep slopes with degraded vegetation), the fertility of soils will be improved, and productivity of land will be increased.
15,000 hazelnut seeds were planted in 35.3 ha in Ehen, Goydan and Talistan villages and Ismayilli Humanitarian and Technology College in autumn 2017. Due to low rainfall during the summer month, there is a need to irrigate hazelnut plantations. The following table provides information about the hazelnut plantation area:
Objectives and tasks
The objective of the assignment is to develop a design of the drip irrigation system for the 35.3 hectares of hazelnut, planted in autumn 2017.
In particular the expert shall fulfil the following tasks:
Determine the water source for irrigation for each hazelnut orchard in Ehen, Talistan, Goydan and College;
Calculate monthly water consumption for each orchard (taking into account the amount of rainfall and evaporation);
Develop the project (including detailed list of materials) for a drip irrigation system;
Calculate the cost of materials and labour for each area.
Prepare tender documents for the indicated project areas
The consultant will coordinate closely in all technical matters with Samir Abbasov (advisor in GIZ-IBiS AZ).
The field coordinators of GIZ-IBiS project will assist the consultant during all field visits.
The consultant will coordinate closely in all contractual issues with Dr. Patric Schlager, team leader of GIZ-IBiS in Azerbaijan.
Expected outputs
Expected outputs are:
The information on water source for irrigation of indicated areas is provided
Water demand for every plantation area is provided;
Design of a drip irrigation system;
Tender documents for indicated areas of the project are provided:
Situation Plans for water resources;
Plans of internal irrigation networks;
Volume of works to be done;
Cost of materials to be spent;
Cost of construction and installation works.
Final Report.
Format for reports and documentations will be provided by GIZ-IBiS.
All documents and reports shall be delivered electronically (text files) in English language to GIZ-IBiS. The consultant shall report to Samir Abbasov advisor in GIZ-IBiS.
Time frame and work schedule
The assignment covers up to 15 working days within the contract period.
Expected working schedule
Miscellaneous
The political provisions of the Ministry of Ecology and Natural Resources of Republic of Azerbaijan are the basis for the consultancy. This contract will be adjusted under consideration of the interest of contracting parties in case of any changes of these provisions.
Programme: | Integrated Biodiversity Management, South Caucasus (IBiS)
PN: | 15.2101.2-003.00
Assignment: | To develop design of a drip irrigation system for hazelnut plantation in Ismayilli
Period: | 30.03.2018 – 27.04. 2018
Plantation area | Area of hazelnut plant, ha | Perimeter of hazelnut plant, m | Altitude from sea level, m
Ehen | 25.4 | 2315 | 1330-1500
Goydan | 2.60 | 970 | 1518-1574
Talistan | 2.89 | 764 | 765-800
Talistan | 2.66 | 845 | 700-740
Talistan | 0.75 | 453 | 720-745
College | 1 | 520 | 563
Total | 35.3 | |
Determine water source for irrigation for each hazelnut orchard in Ehen, Talistan, Goydan and College | 6 days
Calculate monthly water demand for each orchard (taking into account the amount of rainfall and evaporation) | 2 days
Design of drip irrigation system for each area | 2 days
Calculate the cost of materials and labour for each area | 3 days
Report | 2 days
Total | 15 days
Date
PN
VN (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting points assessment points assessment points assessment points assessment points assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) 1.
1.1 10 1.2 10 1.3 1.4 10 1.5 0 30 2.
2.1 2.2 0 3.
0 4.
4.1 4.1.1 10 15 4.1.2
Civil Engineering 20 4.1.3 15 4.1.4 10 70
Assessor
Qualification of proposed staff
Design, quality control, construction management
General qualification
BSc/MSc; Research and Data collection Skills
Expert 1: Irrigation, Water Supply. Water Resources. Civil Engineering
Appropriateness of suggested concept and work plan
Total 2.
Implementation methods: Management
Staff and backstopping conception (as part of the steering structure))
Technical backstopping / Knowledge Management
Interpretation of objectives
Strategy (technical concept/alternative concepts)
Total 1.
Monitoring and evaluation concept (as part of L+I)
Work schedule and time schedule of processes, Cooperation, Steering structure,
Learning and Innovation
Knowledge and information management (as part of L+I)
Version (1)
Criteria
Consideration of local resources
Technical Assessment Grid of Offers
Section Division
Individual assessment/Overall assessment
:
Patric SchlagerAV
Company 2 Company 3 Company 4 Company 5
Integrated Biodiversity Management, South Caucasus (IBiS)
Company 1 15.2101.2-003.00
VN
Project Short Title 12/03/2018
Language skills
Specific qualification
- special field
- management experience
- ability to work in a team
Subtotal 4.1
Regional experience / Knowledge of country
Implementation of irrigation projects in mountainous region
Azeri/English
Form 31-2-14-en page 1 of 4
Date
PN
VN (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting points assessment points assessment points assessment points assessment points assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3)
Assessor
Version (1)
Criteria
Technical Assessment Grid of Offers
Section Division
Individual assessment/Overall assessment
:
Patric SchlagerAV
Company 2 Company 3 Company 4 Company 5
Integrated Biodiversity Management, South Caucasus (IBiS)
Company 1 15.2101.2-003.00
VN
Project Short Title 12/03/2018 4.2 4.2.1 4.2.2 4.2.3 4.2.4 0 4.3 4.3.1 4.3.2 4.3.3 4.3.4 0 state field
- management experience
- ability to work in a team
Regional experience / Knowledge of country state country / region
Language skills state language
Subtotal 4.3
Subtotal 4.2
Expert 2:
General qualification
Specific qualification
- special field
- management experience
- ability to work in a team
Regional experience / Knowledge of country
Language skills
Expert 3:
General qualification
- B30
- professional experience
Specific qualification
- special field
Form 31-2-14-en page 2 of 4
Date
PN
VN (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting points assessment points assessment points assessment points assessment points assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3)
Assessor
Version (1)
Criteria
Technical Assessment Grid of Offers
Section Division
Individual assessment/Overall assessment
:
Patric SchlagerAV
Company 2 Company 3 Company 4 Company 5
Integrated Biodiversity Management, South Caucasus (IBiS)
Company 1 15.2101.2-003.00
VN
Project Short Title 12/03/2018 4.4 4.4.1 4.4.2 4.4.3 4.4.4 0 4.5 4.5.1 4.5.2 4.5.3 4.5.4 0
Subtotal 4.4 state language
Expert 4:
General qualification
Language skills
- training
- professional experience
Specific qualification
- special field state field
- management experience
- ability to work in a team
Regional experience / Knowledge of country state country / region
General qualification
- training
- professional experience
Pool of experts 1:
- management experience
- ability to work in a team
Regional experience / Knowledge of country state country / region
Specific qualification
- special field state field
Language skills
Subtotal 4.5 state language
Form 31-2-14-en page 3 of 4
Date
PN
VN (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4)
Weighting points assessment points assessment points assessment points assessment points assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3)
Assessor
Version (1)
Criteria
Technical Assessment Grid of Offers
Section Division
Individual assessment/Overall assessment
:
Patric SchlagerAV
Company 2 Company 3 Company 4 Company 5
Integrated Biodiversity Management, South Caucasus (IBiS)
Company 1 15.2101.2-003.00
VN
Project Short Title 12/03/2018 4.6 4.6.1 4.6.2 4.6.3 4.6.4 0 4.7 70 100
Assessment in % 0 0 0 0 0 5.
- training
- professional experience
I hereby declare that I conducted this evaluation independently and to the best of my knowledge and belief. I will treat the information confidentially and not pass on any particulars of the on-going evaluation procedure.
Date, signature place
Special advantages / risks (see extra page) place
Language skills state language
Subtotal 4.6
Composition of the team
Grand Total 1. – 4.
Total 4.
- special field state field
- management experience
- ability to work in a team
Regional experience / Knowledge of country state country / region
Specific qualification
Pool of experts 2:
General qualification
Gewichtungen müssen insgesamt 100 ergeben.
Form 31-2-14-en page 4 of 4
Attachments
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH