Məzmuna keç
    Tender

    TENDER [Cultivation of Climate-Resilient Pomegranate and Persimmon Varieties and the Establishment of Backyard Produce Collection and Market Access Structures]

    4/28/2026Son tarix: 5/13/2026Bakı

    Təsvir

    Dear Sir/Madam,


    We intend to award a contract for the services/works described in the enclosed procurement documents.

    Please submit your self-declaration of eligibility using the designated form and your technical and financial bids by 13.05.2026 23:59 in English only to ge_quotation@giz.de.

    Əlavə olunmuş sənəddən

    Martina Kolb Samir Abbasov, Rovshan Abbasov, Nino Janelidze Individual assessment/overall assessment (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4) Weighting Points Assessment Points Assessment Points Assessment Points Assessment Points Assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) 1 1.1 1.1.1 6% 0,0 0,0 0,0 0,0 0,0 1.1.2 5% 0,0 0,0 0,0 0,0 0,0 11% 0,0 0,0 0,0 0,0 0,0 1.2 1.2.1 2% 0,0 0,0 0,0 0,0 0,0 1.2.2 2% 0,0 0,0 0,0 0,0 0,0 4% 0,0 0,0 0,0 0,0 0,0 1.3 1.3.1 3% 0,0 0,0 0,0 0,0 0,0 1.3.2 3% 0,0 0,0 0,0 0,0 0,0 6% 0,0 0,0 0,0 0,0 0,0 1.4 1.4.1 5% 0,0 0,0 0,0 0,0 0,0 1.4.2 2% 0,0 0,0 0,0 0,0 0,0 7% 0,0 0,0 0,0 0,0 0,0 1.5 1.5.1 4% 0,0 0,0 0,0 0,0 0,0 1.5.2 4% 0,0 0,0 0,0 0,0 0,0 8% 0,0 0,0 0,0 0,0 0,0 1.6 1.6.1 2% 0,0 0,0 0,0 0,0 0,0 1.6.2 2% 0,0 0,0 0,0 0,0 0,0 Grid for the technical assessment of bids below the EU threshold (Local) Personnel assignment plan (who, when, what work steps) incl. explanation and specification of expert months (1) Assessor: Version (Delete as appropriate): Enter tenderer 1 Project: G-011989-005.00 Enter tenderer 2 Enter tenderer 3 Enter tenderer 4 Enter tenderer 5 Tenderers 1 to 5 of 10 Services put out to tender: Cultivation of Climate-Resilient Pomegranate and Persimmon Varieties and the Establishment of Backyard Produce Collection and Market Access Structures Promoting Green Deal Readiness in the Eastern Partnership Countries (PROGRESS) Processing number: Transaction number: Officer responsible for the commission: Interim total 1.1 Interim total 1.2 Interim total 1.3 Interim total 1.4 Interim total 1.5 Assessment of technical-methodological design Cooperation Steering structure Processes Learning and innovation Criterion Strategy Interpretation of the objectives in the ToRs, critical examination of tasks Presentation and interaction between the relevant actors in the contractor's area of responsibility Strategy for establishing cooperation and then cooperating with the relevant actors Approach and procedure for steering the measures with the project partners Description of contractor's contribution to results monitoring and the associated challenges Presentation and explanation of the implementation plan: work steps, milestones, schedule Presentation and explanation of the integration of the partner contributions Description and justification of the contractor's strategy for delivering the services put out to tender Project management of the contractor Approach and procedure for coordination with/in GIZ project Contractor's contribution to knowledge management at the partner and at GIZ Presentation and explanation of the measures undertaken by the contractor to promote scaling-up effects Form 31-8-1-de Page 1 of 5 Martina Kolb Samir Abbasov, Rovshan Abbasov, Nino Janelidze Individual assessment/overall assessment (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4) Weighting Points Assessment Points Assessment Points Assessment Points Assessment Points Assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) Grid for the technical assessment of bids below the EU threshold (Local) (1) Assessor: Version (Delete as appropriate): Enter tenderer 1 Project: G-011989-005.00 Enter tenderer 2 Enter tenderer 3 Enter tenderer 4 Enter tenderer 5 Tenderers 1 to 5 of 10 Services put out to tender: Cultivation of Climate-Resilient Pomegranate and Persimmon Varieties and the Establishment of Backyard Produce Collection and Market Access Structures Promoting Green Deal Readiness in the Eastern Partnership Countries (PROGRESS) Processing number: Transaction number: Officer responsible for the commission: Criterion 1.6.3 0,0 0,0 0,0 0,0 0,0 4% 0,0 0,0 0,0 0,0 0,0 1.7 0,0 0,0 0,0 0,0 0,0 40% 0,0 0,0 0,0 0,0 0,0 2 2.1 2.1.1 2% 0,0 0,0 0,0 0,0 0,0 2.1.2 2% 0,0 0,0 0,0 0,0 0,0 2.1.3 2% 0,0 0,0 0,0 0,0 0,0 2.1.4 2% 0,0 0,0 0,0 0,0 0,0 2.1.5 2% 0,0 0,0 0,0 0,0 0,0 2.1.6 1% 0,0 0,0 0,0 0,0 0,0 2.1.7 2% 0,0 0,0 0,0 0,0 0,0 2.1.8 0% 0,0 0,0 0,0 0,0 0,0 13% 0,0 0,0 0,0 0,0 0,0 2.2 2.2.1 2% 0,0 0,0 0,0 0,0 0,0 2.2.2 2% 0,0 0,0 0,0 0,0 0,0 2.2.3 2% 0,0 0,0 0,0 0,0 0,0 2.2.4 2% 0,0 0,0 0,0 0,0 0,0 2.2.5 0% 0,0 0,0 0,0 0,0 0,0 2.2.6 2% 0,0 0,0 0,0 0,0 0,0 2.2.7 1% 0,0 0,0 0,0 0,0 0,0 2.2.8 0% 0,0 0,0 0,0 0,0 0,0 11% 0,0 0,0 0,0 0,0 0,0 2.3 2.3.1 2% 0,0 0,0 0,0 0,0 0,0 2.3.2 2% 0,0 0,0 0,0 0,0 0,0 2.3.3 3% 0,0 0,0 0,0 0,0 0,0 2.3.4 2% 0,0 0,0 0,0 0,0 0,0 2.3.5 0% 0,0 0,0 0,0 0,0 0,0 2.3.6 2% 0,0 0,0 0,0 0,0 0,0 2.3.7 1% 0,0 0,0 0,0 0,0 0,0 2.3.8 0% 0,0 0,0 0,0 0,0 0,0 - Leadership/management experience - Regional experience Interim total 2.2 - Development cooperation experience - Other - Development cooperation experience - Qualifications - Language - Specific professional experience - General professional experience - Leadership/management experience - Regional experience - Specific professional experience - Leadership/management experience - Regional experience Interim total 2.1 Expert 1 (in accordance with ToR provisions/criteria) Further requirements - Qualifications - General professional experience - Specific professional experience - Language - Qualifications - Language - General professional experience - Development cooperation experience - Other Expert 2 (in accordance with ToR provisions/criteria) - Other Interim total 1.6 Assessment of proposed staff Team Leader (in accordance with ToR provisions/criteria) Contractor's backstopping strategy (incl. CVs of the technical and administrative backstopper) Total 1 Page 2 of 5 Martina Kolb Samir Abbasov, Rovshan Abbasov, Nino Janelidze Individual assessment/overall assessment (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4) Weighting Points Assessment Points Assessment Points Assessment Points Assessment Points Assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) Grid for the technical assessment of bids below the EU threshold (Local) (1) Assessor: Version (Delete as appropriate): Enter tenderer 1 Project: G-011989-005.00 Enter tenderer 2 Enter tenderer 3 Enter tenderer 4 Enter tenderer 5 Tenderers 1 to 5 of 10 Services put out to tender: Cultivation of Climate-Resilient Pomegranate and Persimmon Varieties and the Establishment of Backyard Produce Collection and Market Access Structures Promoting Green Deal Readiness in the Eastern Partnership Countries (PROGRESS) Processing number: Transaction number: Officer responsible for the commission: Criterion 12% 0,0 0,0 0,0 0,0 0,0 2.4 2.4.1 2% 0,0 0,0 0,0 0,0 0,0 2.4.2 2% 0,0 0,0 0,0 0,0 0,0 2.4.3 2% 0,0 0,0 0,0 0,0 0,0 2.4.4 3% 0,0 0,0 0,0 0,0 0,0 2.4.5 0% 0,0 0,0 0,0 0,0 0,0 2.4.6 1% 0,0 0,0 0,0 0,0 0,0 2.4.7 1% 0,0 0,0 0,0 0,0 0,0 2.4.8 0% 0,0 0,0 0,0 0,0 0,0 11% 0,0 0,0 0,0 0,0 0,0 2.5 2.5.1 2% 0,0 0,0 0,0 0,0 0,0 2.5.2 1% 0,0 0,0 0,0 0,0 0,0 2.5.3 3% 0,0 0,0 0,0 0,0 0,0 2.5.4 2% 0,0 0,0 0,0 0,0 0,0 2.5.5 0% 0,0 0,0 0,0 0,0 0,0 2.5.6 3% 0,0 0,0 0,0 0,0 0,0 2.5.7 2% 0,0 0,0 0,0 0,0 0,0 2.5.8 0% 0,0 0,0 0,0 0,0 0,0 13% 0,0 0,0 0,0 0,0 0,0 2.6 2.6.1 0% 0,0 0,0 0,0 0,0 0,0 2.6.2 0% 0,0 0,0 0,0 0,0 0,0 2.6.3 0% 0,0 0,0 0,0 0,0 0,0 2.6.4 0% 0,0 0,0 0,0 0,0 0,0 2.6.5 0% 0,0 0,0 0,0 0,0 0,0 2.6.6 0% 0,0 0,0 0,0 0,0 0,0 2.6.7 0% 0,0 0,0 0,0 0,0 0,0 0% 0,0 0,0 0,0 0,0 0,0 2.7 2.7.1 0% 0,0 0,0 0,0 0,0 0,0 2.7.2 0% 0,0 0,0 0,0 0,0 0,0 Short-term expert pool 1 (in accordance with ToR provisions/criteria) - Qualifications - Qualifications - Language - Other Interim total 2.6 - Regional experience - Language - General professional experience Short-term expert pool 2 (in accordance with ToR provisions/criteria) - Regional experience - Other - Language - General professional experience Interim total 2.3 Expert 4 (in accordance with ToR provisions/criteria) - Qualifications - Language - General professional experience - Specific professional experience - Leadership/management experience - Regional experience - Development cooperation experience - Development cooperation experience - Development cooperation experience - Other - Qualifications Interim total 2.5 - Specific professional experience Expert 3 (in accordance with ToR provisions/criteria) - Specific professional experience - Leadership/management experience Interim total 2.4 Page 3 of 5 Martina Kolb Samir Abbasov, Rovshan Abbasov, Nino Janelidze Individual assessment/overall assessment (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4) Weighting Points Assessment Points Assessment Points Assessment Points Assessment Points Assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) Grid for the technical assessment of bids below the EU threshold (Local) (1) Assessor: Version (Delete as appropriate): Enter tenderer 1 Project: G-011989-005.00 Enter tenderer 2 Enter tenderer 3 Enter tenderer 4 Enter tenderer 5 Tenderers 1 to 5 of 10 Services put out to tender: Cultivation of Climate-Resilient Pomegranate and Persimmon Varieties and the Establishment of Backyard Produce Collection and Market Access Structures Promoting Green Deal Readiness in the Eastern Partnership Countries (PROGRESS) Processing number: Transaction number: Officer responsible for the commission: Criterion 2.7.3 0% 0,0 0,0 0,0 0,0 0,0 2.7.4 0% 0,0 0,0 0,0 0,0 0,0 2.7.5 0% 0,0 0,0 0,0 0,0 0,0 2.7.6 0% 0,0 0,0 0,0 0,0 0,0 2.7.7 0% 0,0 0,0 0,0 0,0 0,0 0% 0,0 0,0 0,0 0,0 0,0 2.8 2.8.1 0,0 0,0 0,0 0,0 0,0 2.8.2 0% 0,0 0,0 0,0 0,0 0,0 2.8.3 0% 0,0 0,0 0,0 0,0 0,0 0% 0,0 0,0 0,0 0,0 0,0 60% 0,0 0,0 0,0 0,0 0,0 3 3.1 10,0 0,0 10,0 0,0 10,0 0,0 10,0 0,0 10,0 0,0 3.2 10,0 0,0 10,0 0,0 10,0 0,0 10,0 0,0 10,0 0,0 0% 0,0 0,0 0,0 0,0 0,0 100% 0,0 0,0 0,0 0,0 0,0 0,00% 0,00% 0,00% 0,00% 0,00% - Specific professional experience - Leadership/management experience - Other Interim total 2.7 - General professional experience Composition and sufficient assignment duration of the team in order to perform the tasks specified in the schedule and personnel assignment plan Assessment of proposed personnel for non-specified positions (provided permissible under ToRs) - Development cooperation experience Assessment in % I hereby declare that I completed this assessment independently, to the best of my knowledge and in good faith. Overall total 1 + 2 +3 Ranking Total 2 Qualifications and sufficient assignment duration of the team (professional experience and other specific experience) in order to process theme 2 Qualifications and sufficient assignment duration of the team (professional experience and other specific experience) in order to process theme 1 Experience of the company / organization Total 3 Interim total 2.8 Page 4 of 5 Martina Kolb Samir Abbasov, Rovshan Abbasov, Nino Janelidze Individual assessment/overall assessment (2) (3) (4) (3) (4) (3) (4) (3) (4) (3) (4) Weighting Points Assessment Points Assessment Points Assessment Points Assessment Points Assessment in % (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) (max.10) (2)x(3) Grid for the technical assessment of bids below the EU threshold (Local) (1) Assessor: Version (Delete as appropriate): Enter tenderer 1 Project: G-011989-005.00 Enter tenderer 2 Enter tenderer 3 Enter tenderer 4 Enter tenderer 5 Tenderers 1 to 5 of 10 Services put out to tender: Cultivation of Climate-Resilient Pomegranate and Persimmon Varieties and the Establishment of Backyard Produce Collection and Market Access Structures Promoting Green Deal Readiness in the Eastern Partnership Countries (PROGRESS) Processing number: Transaction number: Officer responsible for the commission: Criterion Date, name Page 5 of 5 Terms of reference (ToR) for the procurement of services below the EU threshold Form 41-14-6-en 1 • CONFIDENTIAL Cultivation of Climate-Resilient Pomegranate and Persimmon Varieties and the Establishment of Backyard Produce Collection and Market Access Structures Project number/ cost centre: G-011989-005.00 0. List of Abbreviation ................................ ................................ ................................ ....... 2 1. Context ................................ ................................ ................................ ......................... 3 2. Tasks to be performed by the contractor ................................ ................................ ...... 4 3. Concept ................................ ................................ ................................ .......................10 Technical-methodological concept ................................ ................................ ..............10 Project management of the contractor (1.6) ................................ ................................ 11 4. Personnel concept................................ ................................ ................................ .......11 5. Costing requirements ................................ ................................ ................................ ..14 Assignment of personnel and travel expenses ................................ ............................14 Sustainability aspects for travel ................................ ................................ ...................14 6. Requirements on the format of the tender ................................ ................................ ...16 2 0. List of Abbreviation GHG Greenhouse gas GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit GmbH MoA Ministry of Agriculture of the Republic of Azerbaijan PROGRESS Promoting Green Deal Readiness in the Eastern Partnership Countries WP Work Package 3 1. Context The project ‘Promoting Green Deal Readiness in the Eastern Partnership Countries’ (PROGRESS) is implemented by a consortium led by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH and funded by the Federal Ministry for the Environment, Climate Action, Nature Conservation and Nuclear Safety (BMUKN). The duration of the project is 4.5 years (10/2023 – 04/2028), and the budget is 20 million EUR. PROGRESS supports the countries of the Eastern Partnership (EaP) in their transition to climate-oriented, resilient, and green economic development. It aims to improve the conditions for the transformation of selected agricultural and related industrial fo od value chains. The project promotes the introduction of innovative technologies, tools and methodologies that provide a significant impetus for a transition to greater sustainability, climate resilience and longterm Greenhouse Gas (GHG) mitigation in th e region, accompanied by improved enabling framework conditions. Better access to financing options and support for the further improvement of existing financing mechanisms and instruments involving, for example national banks, development banks and public budgets will facilitate implementation. Good practices and expertise will be fostered via regional exchange and anchored in the institutional structures of the regional and national implementing partners. The project coordination unit is based in Georgia with project representation offices in each of the five partner countries. PROGRESS is implemented through a consortium consisting of GIZ, the Organization for Economic Co -operation and Development (OECD), the Regional Environmental Centre for the Caucasus (REC) in Azerbaijan, Armenia, and Georgia, the European Business Association (EBA) based in Moldova and the Institute for Economics and Forecasting of the National Academy of Sciences of Ukraine (IEF) based in Ukraine. GIZ serves as the Partnership Coordinator for the overall project coordination of PROGRESS. Output II focuses on providing measures for climate -oriented, resilient, and green economic development in agriculture and related industries within the selected agro -value chains fruits, berries, and nuts. The project analyses existing public or private support structures and identifies gaps. In Azerbaijan, the Output mainly involves the implementation of demonstration projects in the selected value chains of pomegranate and persimmon. For this purpose, within the PROGRESS project, a total of 10 demonstration projects is expected to be implemented in Azerbaijan by GIZ. It is intended to implement 2 of the 10 pilot projects planned within the framework of this Terms of Reference. The primary objective of these demonstration projects is to introduce climate-oriented, resilient, sustainable, and green economic practices. Key features of these pilot projects include reducing GHG emissions, enhancing resilience to climate -related hazards, implementing drought - resistant measures, and promoting green farming mechanisms. The secondary objective of the demonstration projects in Azerbaijan is to streamline processes within the selected value chains, facilitating the management of all activities from planting to the sale of pomegranate and persimmon fruits. These projects aim to demonstrate innovations at various stages of the pomegranate and persimmon value chain, modernizing cultivation, processing, and sales processes through innovative technologies. All procurement made by the service provider shall be conducted following GIZ's procurement guidelines and the laws and regulations of the Republic of Azerbaijan. 4 2. Tasks to be performed by the contractor The assignment consists of two work packages (WP), each dedicated to implementing one demonstration project. In total, two distinct demonstration projects are planned within the scope of the current tender. Each work package represents a unique demonstrati on activity that will be executed in parallel. WP1. Participatory Selection and Performance Assessment of Climate -Resilient Pomegranate and Persimmon Varieties Agriculture in Azerbaijan is increasingly exposed to the adverse impacts of climate change, including intensifying water scarcity, rising average temperatures, more frequent heat waves, and prolonged rainless periods. Higher temperatures accelerate evapotranspiration, reduce soil moisture availability, and increase irrigation demand. Simultaneously, heat stress directly affects fruit tree physiology, resulting in reduced yields, impaired fruit quality, and greater vulnerability to pests and diseases. Changing precipitation patterns, characterised by shorter rainy seasons and extended drought spells, further undermine the reliability of both rain -fed and irrigated production systems. These pressures are particularly severe in semi -arid and arid regions, where declining river flows, reduced groundwater recharge, and growing inter -sectoral competition for water contribute to persistent irrigation deficits. Consequently, traditional fruit varieties that were previously well-adapted to local conditions are becoming increasingly vulnerable, threatening farm incomes, rural livelihoods, and long-term agricultural sustainability. In this context, adapting production systems to evolving climatic conditions is more sustainable than relying solely on expanding irrigation infrastructure. One of the most cost -effective adaptation strategies is the systematic identification, evaluation, and promotion of climate - resilient crop varieties already available within the country or region. WP1 aims to identify, evaluate, and demonstrate existing pomegranate and persimmon varieties with enhanced tolerance to drought and heat stress under Azerbaijan’s changing climatic conditions. The intervention focuses on systematic varietal selection, adaptive field testing, and participatory performance assessment rather than genetic breeding. Through structured field trials conducted in close cooperation with national research institutions and farmers, the project will generate evidence on yield stability, water-use efficiency, fruit quality, and stress tolerance. The results will inform the development of agro -ecological zone-specific cultivation guidelines and support the broader adoption of climate-resilient orchard management practices. The results of this pilot activity are planned to be monitored by the end of the project. The main goal of this pilot activity is to select trees variet
    Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

    Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

    303 elan

    Winter Park Plaza 75, Rasul Rza street, office no.202, Baku
    http://www.giz.de/giz-aserbaidschan@giz.de(99412) 599 91 20

    Bunlar təşkilatın öz əlaqə məlumatlarıdır. AZERWEB.AZ yalnız onun elanlarını dərc edir.

    Şirkət profili

    Paylaş

    Əlavələr (7)

    GIZ: digər elanlar

    Bütün 303 elan