Application period has ended (6/22/2026). Browse current announcements
Call for Proposals: Selection of Implementing Partner for Rehabilitation of Traditional Kahriz Water Systems in BTC Corridor Communities.
CALL FOR PROPOSALS
REFERENCE: Selection of Implementing Partner for Rehabilitation of Traditional Kahriz Water Systems in BTC Corridor Communities.
The proposal must be submitted on or before 10:00 (local time) on Monday, 22 June 2026, via email address: scea@socarmidstream.az.
Background
SOCAR Midstream Operations LLC (SOCAR Midstream) and its co-venturers in BTC invite qualified organizations to submit proposals for the implementation of a kahriz (traditional underground water system) restoration project in selected rural communities located along the BTC pipeline corridor.
This initiative is part of SOCAR Midstream Social Investments program aimed at:
Improving access to sustainable water resources
Enhancing rural livelihoods and resilience
Preserving cultural and historical heritage
Supporting communities affected by pipeline operations
The project will also honor the memory of war martyrs by integrating commemorative elements into the infrastructure.
Project Purpose
Restore and sustain reliable access to water in rural communities by rehabilitating traditional kahriz underground water systems, dedicating the intervention to the memory of war martyrs.
Project Product
Rehabilitation and equipping of an existing kahriz system
Tunnel cleaning and debris removal
Structural reinforcement of underground galleries and shafts
Restoration of water flow
Construction of a traditional outlet structure
Installation of memorial marble elements
Establishment of Water User Councils
Project Reach
Ashaghi Gushchu village, Tovuz region – Gurdlu kahriz
Alibayli village, Tovuz region – Kand kahriz
These rural communities are dependent on groundwater for:
Domestic consumption
Agricultural irrigation
Livestock watering
Deliverables
The selected Implementing Partner shall deliver:
Technical Works
Cleaning, rehabilitation and structural reinforcement of underground galleries of the existing kahriz system.
Rehabilitation of vertical shafts: Installation of sealed lids on vertical wells (stainless or anti-corrosive painted) with locks; installation of reinforced concrete rings inside wells.
Restoration of continuous water flow.
Infrastructure
Construction of a stone water outlet structure in national architectural style, including:
Construction of a protective cover and fencing at the kahriz outlet to prevent rain contamination and livestock access
Water collection point
Area for carpet washing and domestic use
Memorial marble plaques
Landscaping
Planting of 7 mature chinar trees (minimum age - 7 years)
Installation of 7 benches under trees
Creation of a small communal space
Community Governance
Establishment of a Water User Council (5 members):
Gender-balanced (at least 2 women)
Representation of the youth and elderly
Inclusive of all community groups
Capacity Building
Selection of 2 local kankans (traditional kahriz specialists)
Delivery of technical and safety training
Development of maintenance schedule (twice annually)
HSE Compliance
Implementation of fully confined space safety procedures
Risk assessments and mitigation measures
Provision of PPE and safety training
Emergency Response Plan (ERP) including rescue, first aid, and evacuation
Project Duration
Start: August 2026
Completion: One kahriz by mid-December 2026; another by the end of Q1 2027
Proposal Submission Instructions
Interested organizations must include:
Implementation approach and methodology
Technical design concept (including all the dimensions (length, depth, diameter)
Detailed work plan (monthly breakdown)
Training program description
Sustainability approach
Risk assessment and mitigation measures
Stakeholder engagement strategy
Monitoring and Evaluation framework
Appraisal Criteria
Proposals will be evaluated based on:
Technical Quality: Understanding of kahriz systems and feasibility
HSE Standards: Compliance with confined space and construction safety
Operational Capacity: Relevant experience and qualified staff
Capacity Building: Quality of training and knowledge transfer
Financial Competitiveness: Value for money and cost transparency
Monitoring & Evaluation: Clarity of KPIs and reporting mechanisms
Monitoring and Evaluation
Applicants must define:
Key Performance Indicators (KPIs), including:
Water flow restored (liters/sec)
Number of beneficiaries
Functionality after completion
Data collection methods
Monitoring frequency
Reporting format (monthly, final)
Impact evaluation approach
SOCAR will conduct bi-weekly field monitoring visits.
Budget Requirements
Applicants must submit:
Detailed break-down Excel budget
Budget narrative explaining each cost
Activity-based cost breakdown
Unit rates (length, diameter, excavation depth, etc.)
Any co-financing contributions (if applicable)
Legal and Confidentiality
SOCAR reserves the right to:
Review and evaluate all proposals
Share submissions with independent experts under confidentiality
Reject any or all applications
Applicants must comply with Azerbaijani legislation.
Environmental and Social Requirements
Applicants must demonstrate:
Sustainable groundwater use
Minimal environmental impact
Safe waste disposal practices
Protection of natural recharge zones
Payment Terms
Payments in AZN
Based on milestone completion
Paid within 30 days after acceptance of deliverables
Deadline
We will only consider applications which are received via scea@socarmidstream.az by 22.06.2026, 10:00 (local time).
Before submitting your application, please make sure that:
They are well received before the application deadline
The file is complete and readable before submitting
They meet all formal requirements.
SOCAR Midstream Operations LLC
4 announcements
These are the organisation's own contacts. AZERWEB.AZ only publishes its announcements.
View Company Profile